Differences between revisions 2 and 10 (spanning 8 versions)
Revision 2 as of 2016-07-27 13:56:14
Size: 1198
Editor: YoichiAso
Comment:
Revision 10 as of 2016-07-29 13:03:42
Size: 2504
Editor: AyakaShoda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
Schedule Chart ([[https://www.dropbox.com/s/in8snejffra66as/VIS%20Overall%20Schedule%2020160720.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/byl5lkwhp0p25kb/VIS%20Overall%20Schedule-160720.mpp?dl=0|MPP]]) -> Something wrong with the Project Server. Aso will try to fix it. Schedule Chart ([[https://www.dropbox.com/s/xnwas3z51u821md/VIS%20Overall%20Schedule%2020160727.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/ys1u5r4wqb2b3ol/VIS%20Overall%20Schedule-160727.mpp?dl=0|MPP]])
Line 10: Line 10:
 * Put a report here  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA|Minutes of Type-A Meeting]]
 * Type-A installation procedure review on the 10th in August.
Line 16: Line 17:
 * Put a report here  * Type-Bp modification 3D drawings
  * Detailed design is ongoing at ATC. (To be updated at 8/5.)
  * Installation jig for the protection of the Traverser is under discussion.
 * F7 LVDT
  * The test bench for the small F7 LVDT will be made at first.
  * Sato-san made the drawings for the small test bench. They will be ordered soon.
  * Okutomi-kun is starting the test of Virgo F7 LVDT.
 * Installation related issues
  * Waiting for the update.
 * Simulation and others
  * YAW coupling ratio is estimated from the iKAGRA PR3 data [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1865|k-log]]

 * '''A/I'''
  * Simulation without OSEM sensors and with the length sensing optical sensor.
  * Check the existing items and their status
Line 22: Line 37:
 * Put a report here  * Materials to use in meeting.[[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0054/E1605412/001/Soft_Shutdown-WDS_Experiment_report-160729.pdf|PDF]]
Line 27: Line 43:
 * Issues  * Inertial sensor selection for Type-B update (Fabian)
  * [[https://dl.dropboxusercontent.com/u/99018438/Geophone_Kamioka.png|Plot1]], [[https://dl.dropboxusercontent.com/u/99018438/Geophone_Kamioka_noise_ratio.png|Plot2]]
 * Wide OSEM
  * Mass production status (Akutsu)
 * Document Tree
  * [[https://www.dropbox.com/s/c688de3olu9l1vx/bKAGRA_Input.dxf?dl=0|VIS Document Tree]]
Line 36: Line 58:
Line 40: Line 61:
  * Mark: 1 - 5 ?
  * Fabian: 1 - 5 ?
  * Mark:
  * Fabian:
Line 51: Line 72:
  * Shoda:
  * Mark: 
  * Fabian: 
  * Shoda:8-10 (check existing parts)
  * Mark:
  * Fabian:

Agenda/Minutes of the VIS Meeting on 2016/7/29

2016/7/29 13:30 - @ Room 210

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

Type-B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Type-Bp modification 3D drawings
    • Detailed design is ongoing at ATC. (To be updated at 8/5.)
    • Installation jig for the protection of the Traverser is under discussion.
  • F7 LVDT
    • The test bench for the small F7 LVDT will be made at first.
    • Sato-san made the drawings for the small test bench. They will be ordered soon.
    • Okutomi-kun is starting the test of Virgo F7 LVDT.
  • Installation related issues
    • Waiting for the update.
  • Simulation and others
    • YAW coupling ratio is estimated from the iKAGRA PR3 data k-log

  • A/I

    • Simulation without OSEM sensors and with the length sensing optical sensor.
    • Check the existing items and their status

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Materials to use in meeting.PDF

Safety

  • Any issue ?

Discussion

  • Inertial sensor selection for Type-B update (Fabian)
  • Wide OSEM
    • Mass production status (Akutsu)
  • Document Tree

Site work plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 8/1):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:
  • Travel (Week of 8/8):
    • Takahashi:
    • Shoda:8-10 (check existing parts)

    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:

Next meeting

2016/8/5(Fri) 13:30 -

KAGRA/Subgroups/VIS/VISMinutes20160729 (last edited 2016-07-29 15:50:31 by YoichiAso)