Size: 1198
Comment:
|
Size: 1228
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
Schedule Chart ([[https://www.dropbox.com/s/in8snejffra66as/VIS%20Overall%20Schedule%2020160720.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/byl5lkwhp0p25kb/VIS%20Overall%20Schedule-160720.mpp?dl=0|MPP]]) -> Something wrong with the Project Server. Aso will try to fix it. | Schedule Chart ([[https://www.dropbox.com/s/xnwas3z51u821md/VIS%20Overall%20Schedule%2020160727.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/ys1u5r4wqb2b3ol/VIS%20Overall%20Schedule-160727.mpp?dl=0|MPP]]) |
Line 27: | Line 27: |
* Issues | * Inertial sensor selection for Type-B update (Fabian) * Wide OSEM * Mass production status (Akutsu) |
Agenda/Minutes of the VIS Meeting on 2016/7/29
2016/7/29 13:30 - @ Room 210
Participants:
Progress report
Type-A (Takahashi)
- Put a report here
Type-B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Any issue ?
Discussion
- Inertial sensor selection for Type-B update (Fabian)
- Wide OSEM
- Mass production status (Akutsu)
Site work plan for the next week
- Mon:
- Tue:
- Wed:
- Thu:
- Fri:
Travel Plans
- Travel (Week of 8/1):
- Takahashi:
- Shoda:
- Mark: 1 - 5 ?
- Fabian: 1 - 5 ?
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
- Travel (Week of 8/8):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
Next meeting
2016/8/5(Fri) 13:30 -