Line 7: Line 7:
Schedule Chart ([[https://www.dropbox.com/s/in8snejffra66as/VIS%20Overall%20Schedule%2020160720.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/byl5lkwhp0p25kb/VIS%20Overall%20Schedule-160720.mpp?dl=0|MPP]]) -> Something wrong with the Project Server. Aso will try to fix it. Schedule Chart ([[https://www.dropbox.com/s/xnwas3z51u821md/VIS%20Overall%20Schedule%2020160727.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/ys1u5r4wqb2b3ol/VIS%20Overall%20Schedule-160727.mpp?dl=0|MPP]])
Line 23: Line 23:
Line 27: Line 28:
 * Issues  * Inertial sensor selection for Type-B update (Fabian)
  * [[https://dl.dropboxusercontent.com/u/99018438/Geophone_Kamioka.png|Plot1]], [[https://dl.dropboxusercontent.com/u/99018438/Geophone_Kamioka_noise_ratio.png|Plot2]]
 * Wide OSEM
  * Mass production status (Akutsu)
Line 36: Line 41:
Line 51: Line 55:
  * Shoda:
  * Mark: 
  * Fabian: 
  * Shoda:8-10 (check existing parts)
  * Mark:
  * Fabian:

Agenda/Minutes of the VIS Meeting on 2016/7/29

2016/7/29 13:30 - @ Room 210

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Put a report here

Type-B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Any issue ?

Discussion

  • Inertial sensor selection for Type-B update (Fabian)
  • Wide OSEM
    • Mass production status (Akutsu)

Site work plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 8/1):
    • Takahashi:
    • Shoda:
    • Mark: 1 - 5 ?
    • Fabian: 1 - 5 ?
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:
  • Travel (Week of 8/8):
    • Takahashi:
    • Shoda:8-10 (check existing parts)

    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:

Next meeting

2016/8/5(Fri) 13:30 -