Size: 1198
Comment:
|
Size: 1781
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
Schedule Chart ([[https://www.dropbox.com/s/in8snejffra66as/VIS%20Overall%20Schedule%2020160720.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/byl5lkwhp0p25kb/VIS%20Overall%20Schedule-160720.mpp?dl=0|MPP]]) -> Something wrong with the Project Server. Aso will try to fix it. | Schedule Chart ([[https://www.dropbox.com/s/xnwas3z51u821md/VIS%20Overall%20Schedule%2020160727.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/ys1u5r4wqb2b3ol/VIS%20Overall%20Schedule-160727.mpp?dl=0|MPP]]) |
Line 10: | Line 10: |
* Put a report here | * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA|Minutes of Type-A Meeting]] * Type-A installation procedure review on the 10th in August. |
Line 22: | Line 23: |
* Put a report here | * Materials to use in meeting.[[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0054/E1605412/001/Soft_Shutdown-WDS_Experiment_report-160729.pdf|PDF]] |
Line 27: | Line 29: |
* Issues | * Inertial sensor selection for Type-B update (Fabian) * [[https://dl.dropboxusercontent.com/u/99018438/Geophone_Kamioka.png|Plot1]], [[https://dl.dropboxusercontent.com/u/99018438/Geophone_Kamioka_noise_ratio.png|Plot2]] * Wide OSEM * Mass production status (Akutsu) * Document Tree * [[https://www.dropbox.com/s/c688de3olu9l1vx/bKAGRA_Input.dxf?dl=0|VIS Document Tree]] |
Line 36: | Line 44: |
Line 40: | Line 47: |
* Mark: 1 - 5 ? * Fabian: 1 - 5 ? |
* Mark: * Fabian: |
Line 51: | Line 58: |
* Shoda: * Mark: * Fabian: |
* Shoda:8-10 (check existing parts) * Mark: * Fabian: |
Agenda/Minutes of the VIS Meeting on 2016/7/29
2016/7/29 13:30 - @ Room 210
Participants:
Progress report
Type-A (Takahashi)
- Type-A installation procedure review on the 10th in August.
Type-B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
Materials to use in meeting.PDF
Safety
- Any issue ?
Discussion
- Inertial sensor selection for Type-B update (Fabian)
- Wide OSEM
- Mass production status (Akutsu)
- Document Tree
Site work plan for the next week
- Mon:
- Tue:
- Wed:
- Thu:
- Fri:
Travel Plans
- Travel (Week of 8/1):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
- Travel (Week of 8/8):
- Takahashi:
Shoda:8-10 (check existing parts)
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
Next meeting
2016/8/5(Fri) 13:30 -