Differences between revisions 5 and 8 (spanning 3 versions)
Revision 5 as of 2016-07-27 16:14:36
Size: 1228
Editor: YoichiAso
Comment:
Revision 8 as of 2016-07-29 11:27:56
Size: 1691
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
Schedule Chart ([[https://www.dropbox.com/s/xnwas3z51u821md/VIS%20Overall%20Schedule%2020160727.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/ys1u5r4wqb2b3ol/VIS%20Overall%20Schedule-160727.mpp?dl=0|MPP]])  Schedule Chart ([[https://www.dropbox.com/s/xnwas3z51u821md/VIS%20Overall%20Schedule%2020160727.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/ys1u5r4wqb2b3ol/VIS%20Overall%20Schedule-160727.mpp?dl=0|MPP]])
Line 10: Line 10:
 * Put a report here  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA|Minutes of Type-A Meeting]]
 * Type-A installation procedure review on the 10th in August.
Line 22: Line 23:
 * Put a report here  * Materials to use in meeting.[[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0054/E1605412/001/Soft_Shutdown-WDS_Experiment_report-160729.pdf | PDF ]]
Line 28: Line 30:
  * [[https://dl.dropboxusercontent.com/u/99018438/Geophone_Kamioka.png|Plot1]], [[https://dl.dropboxusercontent.com/u/99018438/Geophone_Kamioka_noise_ratio.png|Plot2]]
Line 30: Line 33:
Line 38: Line 42:
Line 53: Line 56:
  * Shoda:
  * Mark: 
  * Fabian: 
  * Shoda:8-10 (check existing parts)
  * Mark:
  * Fabian:

Agenda/Minutes of the VIS Meeting on 2016/7/29

2016/7/29 13:30 - @ Room 210

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

Type-B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Materials to use in meeting.PDF

Safety

  • Any issue ?

Discussion

  • Inertial sensor selection for Type-B update (Fabian)
  • Wide OSEM
    • Mass production status (Akutsu)

Site work plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 8/1):
    • Takahashi:
    • Shoda:
    • Mark: 1 - 5 ?
    • Fabian: 1 - 5 ?
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:
  • Travel (Week of 8/8):
    • Takahashi:
    • Shoda:8-10 (check existing parts)

    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:

Next meeting

2016/8/5(Fri) 13:30 -

KAGRA/Subgroups/VIS/VISMinutes20160729 (last edited 2016-07-29 15:50:31 by YoichiAso)