Line 17: Line 17:
 * Put a report here  * Type-Bp modification 3D drawings
  * Detailed design is ongoing at ATC. (To be updated at 8/5.)
  * Installation jig for the protection of the Traverser is under discussion.
 * F7 LVDT
  * The test bench for the small F7 LVDT will be made at first.
  * Sato-san made the drawings for the small test bench. They will be ordered soon.
  * Okutomi-kun is starting the test of Virgo F7 LVDT.
 * Installation related issues
  * Waiting for the update.
 * Simulation and others
  * YAW coupling ratio is estimated from the iKAGRA PR3 data [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1865|k-log]]

 * '''A/I'''
  * Simulation without OSEM sensors and with the length sensing optical sensor.
  * Check the existing items and their status

Agenda/Minutes of the VIS Meeting on 2016/7/29

2016/7/29 13:30 - @ Room 210

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

Type-B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Type-Bp modification 3D drawings
    • Detailed design is ongoing at ATC. (To be updated at 8/5.)
    • Installation jig for the protection of the Traverser is under discussion.
  • F7 LVDT
    • The test bench for the small F7 LVDT will be made at first.
    • Sato-san made the drawings for the small test bench. They will be ordered soon.
    • Okutomi-kun is starting the test of Virgo F7 LVDT.
  • Installation related issues
    • Waiting for the update.
  • Simulation and others
    • YAW coupling ratio is estimated from the iKAGRA PR3 data k-log

  • A/I

    • Simulation without OSEM sensors and with the length sensing optical sensor.
    • Check the existing items and their status

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Materials to use in meeting.PDF

Safety

  • Any issue ?

Discussion

  • Inertial sensor selection for Type-B update (Fabian)
  • Wide OSEM
    • Mass production status (Akutsu)
  • Document Tree

Site work plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 8/1):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:
  • Travel (Week of 8/8):
    • Takahashi:
    • Shoda:8-10 (check existing parts)

    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:

Next meeting

2016/8/5(Fri) 13:30 -