Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2016-08-05 06:27:10
Size: 1513
Editor: YoichiAso
Comment:
Revision 4 as of 2016-08-05 07:31:18
Size: 1572
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * Simulation: Calculation updated
 * EQ stop: The date for the announce of bidding is the 17th. The specification document and drawings should be fixed by the 10th.
 * Installation procedure: The document is under preparation. The review will be held on the 10th.
Line 28: Line 31:
 * Inertial sensor selection for Type-B update (Fabian)
  * [[https://dl.dropboxusercontent.com/u/99018438/Geophone_Kamioka.png|Plot1]], [[https://dl.dropboxusercontent.com/u/99018438/Geophone_Kamioka_noise_ratio.png|Plot2]]
 * Any issue ?
Line 33: Line 34:
 * Mon:
 * Tue:
 * Wed:
 * Thu: BS retrieval at Kashiwa
 * Mon: Check existing parts (Shoda)
 * Tue: Check existing parts (Shoda)
 * Wed: Check existing parts (Shoda)
 * Thu:
Line 40: Line 41:
 * Travel (Week of 8/1):  * Travel (Week of 8/8):
Line 42: Line 43:
  * Shoda:
  * Mark: 4 (Kashiwa)
  * Fabian:4 (Kashiwa)
  * Shoda: 8-10
  * Mark:
  * Fabian:
Line 48: Line 49:
  * Hirata: 4 (Kashiwa)   * Hirata:
Line 52: Line 53:
 * Travel (Week of 8/8):  * Travel (Week of 8/15):
Line 54: Line 55:
  * Shoda:8-10 (check existing parts)
  * Mark:
  * Fabian:
  * Shoda:
  * Mark: 15-19
  * Fabian: 15-19
Line 65: Line 66:
2016/8/5(Fri) 13:30 -

No F2F in August
2016/8/19(Fri) 13:30 -

Agenda/Minutes of the VIS Meeting on 2016/8/5

2016/8/5 13:30 - @ Room 210

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Simulation: Calculation updated
  • EQ stop: The date for the announce of bidding is the 17th. The specification document and drawings should be fixed by the 10th.
  • Installation procedure: The document is under preparation. The review will be held on the 10th.

Type-B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • issues ?

Discussion

  • Any issue ?

Site work plan for the next week

  • Mon: Check existing parts (Shoda)
  • Tue: Check existing parts (Shoda)
  • Wed: Check existing parts (Shoda)
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 8/8):
    • Takahashi:
    • Shoda: 8-10
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:
  • Travel (Week of 8/15):
    • Takahashi:
    • Shoda:
    • Mark: 15-19
    • Fabian: 15-19
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:

Next meeting

2016/8/19(Fri) 13:30 -

KAGRA/Subgroups/VIS/VISMinutes20160805 (last edited 2016-08-05 15:36:12 by YoichiAso)