Line 11: Line 11:
 * Simulation: Calculation updated
 * EQ stop: The date for the announce of bidding is the 17th. The specification document and drawings should be fixed by the 10th.
 * Installation procedure: The document is under preparation. The review will be held on the 10th.

Agenda/Minutes of the VIS Meeting on 2016/8/5

2016/8/5 13:30 - @ Room 210

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Simulation: Calculation updated
  • EQ stop: The date for the announce of bidding is the 17th. The specification document and drawings should be fixed by the 10th.
  • Installation procedure: The document is under preparation. The review will be held on the 10th.

Type-B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • issues ?

Discussion

  • Any issue ?

Site work plan for the next week

  • Mon: Check existing parts (Shoda)
  • Tue: Check existing parts (Shoda)
  • Wed: Check existing parts (Shoda)
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 8/8):
    • Takahashi:
    • Shoda: 8-10
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:
  • Travel (Week of 8/15):
    • Takahashi:
    • Shoda:
    • Mark: 15-19
    • Fabian: 15-19
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:

Next meeting

2016/8/19(Fri) 13:30 -