Size: 1286
Comment:
|
Size: 2810
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
Schedule Chart ([[https://www.dropbox.com/s/a8lc5wyk67m8i6r/VIS%20Overall%20Schedule-20160805.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/bwwenn26jzyg9kn/VIS%20Overall%20Schedule-20160805.mpp?dl=0|MPP]]) | Schedule Chart ([[https://www.dropbox.com/s/g1t88ygow3iub84/VIS%20Overall%20Schedule-20160817.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/nn349ssjnu8aegh/VIS%20Overall%20Schedule-20160817.mpp?dl=0|MPP]]) |
Line 10: | Line 10: |
* Put a report here | * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA|Minutes of Type-A Meeting]] * Task list was updated. * No type-A meeting in this week. * EQ stop, release sensor, dummy payload: The specification document and drawings were fixed. The bidding was announced on the 17th. * Installation procedure: The review was held on the 10th. * Standard filters: Cheking of 6 sets were finished and shipped to Kamioka. * BF damper: LVDT sample is under testing. The measured noise is too large (10^-6 m/rtHz). |
Line 16: | Line 22: |
* Put a report here | * Type-Bp modification * Saito-san made the 1st version of the 2D drawing. Though we still have small modification, we can start cost estimate. * F7 LVDT * Virgo LVDT test is ongoing. The measured calibration factor and noise level is worse than expected. More tuning is required. * Installation related issues * BF weight is lighter than the 3D model. (CAD: 50 kg, measured: 45 kg.) Shoda has not been able to find any reason yet. Further investigation will be done in next week. * Mirapro sent us the design of the optical bench installation jigs. We sent them some request for the update. * The design of the assembly frame is almost fixed. * Simulation and others * None * '''A/I''' * Investigate the BF weight inconsistency (Shoda) * Some 2D drawings not related to the modification (additional masses, OB wire hook, OB wires,,,) (Hirata) * Assembly drawing (Shoda) * Optical bench additional parts design * Organize the mirror preparation |
Line 28: | Line 50: |
* Installation order for Type-B and Type-Bp |
Agenda/Minutes of the VIS Meeting on 2016/8/19
2016/8/19 13:30 - @ Room 210
Participants:
Progress report
Type-A (Takahashi)
- Task list was updated.
- No type-A meeting in this week.
- EQ stop, release sensor, dummy payload: The specification document and drawings were fixed. The bidding was announced on the 17th.
- Installation procedure: The review was held on the 10th.
- Standard filters: Cheking of 6 sets were finished and shipped to Kamioka.
- BF damper: LVDT sample is under testing. The measured noise is too large (10^-6 m/rtHz).
Type-B (Mark)
- Put a report here
Type-Bp (Shoda)
- Type-Bp modification
- Saito-san made the 1st version of the 2D drawing. Though we still have small modification, we can start cost estimate.
- F7 LVDT
- Virgo LVDT test is ongoing. The measured calibration factor and noise level is worse than expected. More tuning is required.
- Installation related issues
- BF weight is lighter than the 3D model. (CAD: 50 kg, measured: 45 kg.) Shoda has not been able to find any reason yet. Further investigation will be done in next week.
- Mirapro sent us the design of the optical bench installation jigs. We sent them some request for the update.
- The design of the assembly frame is almost fixed.
- Simulation and others
- None
A/I
- Investigate the BF weight inconsistency (Shoda)
- Some 2D drawings not related to the modification (additional masses, OB wire hook, OB wires,,,) (Hirata)
- Assembly drawing (Shoda)
- Optical bench additional parts design
- Organize the mirror preparation
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Any issue ?
Discussion
- Installation order for Type-B and Type-Bp
Site work plan for the next week
- Mon: BS test hanging (Mark, Fabian, Zhao)
- Tue: BS test hanging (Mark, Fabian, Zhao)
- Wed: BS test hanging (Mark, Fabian, Zhao)
- Thu: F2F
- Fri: F2F
Travel Plans
- Travel (Week of 8/22):
- Takahashi:
- Shoda:
- Mark: 22-26 ?
- Fabian: 22-26 ?
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
- Travel (Week of 8/29):
- Takahashi: 30 - 9/2 ?
- Shoda:
- Mark: 29 - 9/2 ?
- Fabian: 29 - 9/2 ?
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato: 30 - 9/2 ?
- Ohishi:
Next meeting
2016/9/2(Fri) 13:30 -