Size: 1332
Comment:
|
Size: 1841
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
* Put a report here | * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA|Minutes of Type-A Meeting]] * Task list was updated. * No type-A meeting in this week. * EQ stop, release sensor, dummy payload: The specification document and drawings were fixed. The bidding was announced on the 17th. * Installation procedure: The review was held on the 10th. * Standard filters: Cheking of 6 sets were finished and shipped to Kamioka. * BF damper: LVDT sample is under testing. The measured noise is too large (10^-6 m/rtHz). |
Agenda/Minutes of the VIS Meeting on 2016/8/19
2016/8/19 13:30 - @ Room 210
Participants:
Progress report
Type-A (Takahashi)
- Task list was updated.
- No type-A meeting in this week.
- EQ stop, release sensor, dummy payload: The specification document and drawings were fixed. The bidding was announced on the 17th.
- Installation procedure: The review was held on the 10th.
- Standard filters: Cheking of 6 sets were finished and shipped to Kamioka.
- BF damper: LVDT sample is under testing. The measured noise is too large (10^-6 m/rtHz).
Type-B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Any issue ?
Discussion
- Installation order for Type-B and Type-Bp
Site work plan for the next week
- Mon: BS test hanging (Mark, Fabian, Zhao)
- Tue: BS test hanging (Mark, Fabian, Zhao)
- Wed: BS test hanging (Mark, Fabian, Zhao)
- Thu: F2F
- Fri: F2F
Travel Plans
- Travel (Week of 8/22):
- Takahashi:
- Shoda:
- Mark: 22-26 ?
- Fabian: 22-26 ?
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
- Travel (Week of 8/29):
- Takahashi: 30 - 9/2 ?
- Shoda:
- Mark: 29 - 9/2 ?
- Fabian: 29 - 9/2 ?
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato: 30 - 9/2 ?
- Ohishi:
Next meeting
2016/9/2(Fri) 13:30 -