Size: 2810
Comment:
|
Size: 2922
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 35: | Line 35: |
* Some 2D drawings not related to the modification (additional masses, OB wire hook, OB wires,,,) (Hirata) | * Some 2D drawings not related to the modification (additional masses, OB wire hook, OB wires,,,) (Hirata) |
Line 51: | Line 51: |
* BS(1-3) -> SR3(3-7) -> SR2(7-11) -> SRM (11-) * PR3 (12-3) -> PR2(3-5) -> PRM(5-7) |
|
Line 62: | Line 64: |
* Shoda: | * Shoda: |
Line 76: | Line 78: |
* Fabian: 29 - 9/2 ? | * Fabian: 29 - 9/2 ? |
Line 86: | Line 88: |
Next F2F 2016/9/9 ? |
Agenda/Minutes of the VIS Meeting on 2016/8/19
2016/8/19 13:30 - @ Room 210
Participants:
Progress report
Type-A (Takahashi)
- Task list was updated.
- No type-A meeting in this week.
- EQ stop, release sensor, dummy payload: The specification document and drawings were fixed. The bidding was announced on the 17th.
- Installation procedure: The review was held on the 10th.
- Standard filters: Cheking of 6 sets were finished and shipped to Kamioka.
- BF damper: LVDT sample is under testing. The measured noise is too large (10^-6 m/rtHz).
Type-B (Mark)
- Put a report here
Type-Bp (Shoda)
- Type-Bp modification
- Saito-san made the 1st version of the 2D drawing. Though we still have small modification, we can start cost estimate.
- F7 LVDT
- Virgo LVDT test is ongoing. The measured calibration factor and noise level is worse than expected. More tuning is required.
- Installation related issues
- BF weight is lighter than the 3D model. (CAD: 50 kg, measured: 45 kg.) Shoda has not been able to find any reason yet. Further investigation will be done in next week.
- Mirapro sent us the design of the optical bench installation jigs. We sent them some request for the update.
- The design of the assembly frame is almost fixed.
- Simulation and others
- None
A/I
- Investigate the BF weight inconsistency (Shoda)
- Some 2D drawings not related to the modification (additional masses, OB wire hook, OB wires,,,) (Hirata)
- Assembly drawing (Shoda)
- Optical bench additional parts design
- Organize the mirror preparation
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Any issue ?
Discussion
- Installation order for Type-B and Type-Bp
BS(1-3) -> SR3(3-7) -> SR2(7-11) -> SRM (11-)
PR3 (12-3) -> PR2(3-5) -> PRM(5-7)
Site work plan for the next week
- Mon: BS test hanging (Mark, Fabian, Zhao)
- Tue: BS test hanging (Mark, Fabian, Zhao)
- Wed: BS test hanging (Mark, Fabian, Zhao)
- Thu: F2F
- Fri: F2F
Travel Plans
- Travel (Week of 8/22):
- Takahashi:
- Shoda:
- Mark: 22-26 ?
- Fabian: 22-26 ?
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
- Travel (Week of 8/29):
- Takahashi: 30 - 9/2 ?
- Shoda:
- Mark: 29 - 9/2 ?
- Fabian: 29 - 9/2 ?
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato: 30 - 9/2 ?
- Ohishi:
Next meeting
2016/9/2(Fri) 13:30 -
Next F2F 2016/9/9 ?