Line 7: | Line 7: |
Schedule Chart ([[https://www.dropbox.com/s/mecu9tgoua7jutt/VIS%20Overall%20Schedule-20160831.mpp?dl=0|PDF]],[[https://www.dropbox.com/s/mecu9tgoua7jutt/VIS%20Overall%20Schedule-20160831.mpp?dl=0|MPP]]) | Schedule Chart ([[https://www.dropbox.com/s/v2x7j3w22a6akjk/VIS%20Overall%20Schedule-20160831.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/mecu9tgoua7jutt/VIS%20Overall%20Schedule-20160831.mpp?dl=0|MPP]]) |
Line 10: | Line 10: |
* Put a report here | * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA|Minutes of Type-A Meeting]] * Top chamber: Installation and leak test will be postponed to January due to delay of cooling test of the cryostat. * EQ stop, release sensor, dummy payload: Procurement is in the bidding process. Open bidding is on 13th September. * BF damper: Assembling the LVDT prototype. * Maraging wire: Stress concentration around the head was pointed out by CRY. Now investigationg. |
Line 16: | Line 20: |
* Put a report here | * Type-Bp modification * Saito-san made some updates around the LVDT coils. Shoda is implimenting them into the 3D CAD model. * Obuchi-san provided the result of the structure analysis. Shoda will gather the information and write the design document. * Saito-san is asking the cost estimate to Techno-port and still waiting for the reply. We asked him to ask the cost estimate to another company. * Shoda is preparing the specification sheets for the ordering. * We are planing to have the final design reciew from 12 - 14th September. * Additional ordering for PRs. * additional masses for IM: Hirata-san made the drawing. * additional masses for BF: Shoda is making the model. * IM flags: Hirata-san will make the drawing for the additional machinig. * TM flags: Discussion is ongoing with Aso-san, Mark, and Hirata-san. (Old design parts will be ordered together with BF modification parts just in case.) * 1st wire breakers: will be ordered with BF modification parts * 2nd wire breakers: will be ordered with BF modification parts * the correts for the hexagon cable clamps: the CAD model of the maraging rod is wrong. Re-design will be done by Hirata-san. * maraging rods for BFRM: will be ordered with Type-A maraging rods. * signal cables: will be ordered with Type-A. * BF EQ stop ring: will be ordered together with the assembly frame. * Assembly frame * Design is almost fixed: shown via Seevogh * Optical bench * Installation jigs: shown via Seevogh * Adapters: shown via Seevogh * wires: shown via Seevogh (the hook analysis is necessary?) * missing hooks: shown via Seevogh * Shoda is preparing the specification sheets for the ordering (together with the assembly frame). * Washing * EQ stop: 3sets are in Akeno, un-washed. Takahashi-san will order the washing. * OB-IM, OB-MD: 3sets are not ordered yet. Takahashi-san will order them. * Bottom filter cup * The thickness of the top plate of the cup is different from the design. (12mm -> 11mm) * Mirror preparation * Hirose-san and Shoda are preparing jigs for the flag detaching. [[|Catoon]] * '''A/I''' * Prepare for the final design review. (Shoda) * Make the design document (Shoda, Fujii) * Ordering preparation (Shoda) * Design work around flags (Hirata, Mark) |
Line 19: | Line 68: |
* Put a report here | * Measured location of things in IFI and IMMT chamber with Kasuya-san on 23-24th Aug. It smelled bad (musty) outflow air from the vacuum chamber. * Consider to install IMMT2 suspension from the Top flange of the chamber. Discussing with Somiya-san, Hirose-san and Kawamura-san. * Kitazawa-san (Toyama Univ.) is coming to help coupling measurement of the small OSEMs for IMMT. * 3D2D drawings of current IMMT suspension almost completed. * Next week, MCF chamber will be opened. |
Line 22: | Line 77: |
* Put a report here | * Progress report(For Power circuit re-design)[[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0056/E1605619/001/Project_Power_pert_Re-design160902.pdf |PDF ]] |
Line 28: | Line 83: |
* Installation order for Type-B and Type-Bp * BS(1-3) -> SR3(3-7) -> SR2(7-11) -> SRM (11-) * PR3 (12-3) -> PRM(3-5) -> PR2(5-7) * We need to coordinate the BS area usage with PI assembly work and the transportation of the assembly frame. * Aso, Mark, Takahashi will discuss it F2F. |
* Insufficient strength of the maraging rods ? * Local sensor to monitor the TM motion during assembly |
Line 38: | Line 90: |
* Thu: F2F * Fri: F2F |
* Thu: BS test hanging (Mark, Fabian, Zhao) * Fri: BS test hanging (Mark, Fabian, Zhao) |
Line 42: | Line 94: |
* Travel (Week of 8/22): * Takahashi:25 - 27 * Shoda:22 - 27 * Mark: 22 - 27 * Fabian: 22 or 23 - 27 * Okutomi: 25 - 27 |
* Travel (Week of 9/5): * Takahashi: * Shoda: * Mark: 5 - 8 * Fabian: 5 - 8 * Okutomi: |
Line 54: | Line 106: |
* Travel (Week of 8/29): | * Travel (Week of 9/12): |
Line 57: | Line 109: |
* Mark: 29 - 9/2 * Fabian: 29 - 9/2 |
* Mark: 12 - 15 * Fabian: 12 - 15 |
Line 67: | Line 119: |
2016/9/2(Fri) 13:30 - Next F2F 2016/9/9 |
2016/9/9(Fri) 13:30 - in Mitaka |
Agenda/Minutes of the VIS Meeting on 2016/9/2
2016/9/2 13:30 - @ Room 210
Participants:
Progress report
Type-A (Takahashi)
- Top chamber: Installation and leak test will be postponed to January due to delay of cooling test of the cryostat.
- EQ stop, release sensor, dummy payload: Procurement is in the bidding process. Open bidding is on 13th September.
- BF damper: Assembling the LVDT prototype.
- Maraging wire: Stress concentration around the head was pointed out by CRY. Now investigationg.
Type-B (Mark)
- Put a report her
Type-Bp (Shoda)
- Type-Bp modification
- Saito-san made some updates around the LVDT coils. Shoda is implimenting them into the 3D CAD model.
- Obuchi-san provided the result of the structure analysis. Shoda will gather the information and write the design document.
- Saito-san is asking the cost estimate to Techno-port and still waiting for the reply. We asked him to ask the cost estimate to another company.
- Shoda is preparing the specification sheets for the ordering.
- We are planing to have the final design reciew from 12 - 14th September.
- Additional ordering for PRs.
- additional masses for IM: Hirata-san made the drawing.
- additional masses for BF: Shoda is making the model.
- IM flags: Hirata-san will make the drawing for the additional machinig.
- TM flags: Discussion is ongoing with Aso-san, Mark, and Hirata-san. (Old design parts will be ordered together with BF modification parts just in case.)
- 1st wire breakers: will be ordered with BF modification parts
- 2nd wire breakers: will be ordered with BF modification parts
- the correts for the hexagon cable clamps: the CAD model of the maraging rod is wrong. Re-design will be done by Hirata-san.
- maraging rods for BFRM: will be ordered with Type-A maraging rods.
- signal cables: will be ordered with Type-A.
- BF EQ stop ring: will be ordered together with the assembly frame.
- Assembly frame
- Design is almost fixed: shown via Seevogh
- Optical bench
- Installation jigs: shown via Seevogh
- Adapters: shown via Seevogh
- wires: shown via Seevogh (the hook analysis is necessary?)
- missing hooks: shown via Seevogh
- Shoda is preparing the specification sheets for the ordering (together with the assembly frame).
- Washing
- EQ stop: 3sets are in Akeno, un-washed. Takahashi-san will order the washing.
- OB-IM, OB-MD: 3sets are not ordered yet. Takahashi-san will order them.
- Bottom filter cup
The thickness of the top plate of the cup is different from the design. (12mm -> 11mm)
- Mirror preparation
- Hirose-san and Shoda are preparing jigs for the flag detaching. [[|Catoon]]
A/I
- Prepare for the final design review. (Shoda)
- Make the design document (Shoda, Fujii)
- Ordering preparation (Shoda)
- Design work around flags (Hirata, Mark)
IMMT (Ohishi)
- Measured location of things in IFI and IMMT chamber with Kasuya-san on 23-24th Aug.
- It smelled bad (musty) outflow air from the vacuum chamber.
- Consider to install IMMT2 suspension from the Top flange of the chamber.
- Discussing with Somiya-san, Hirose-san and Kawamura-san.
- Kitazawa-san (Toyama Univ.) is coming to help coupling measurement of the small OSEMs for IMMT.
- 3D2D drawings of current IMMT suspension almost completed.
- Next week, MCF chamber will be opened.
Watchdog system (Tanaka)
Progress report(For Power circuit re-design)PDF
Safety
- Any issue ?
Discussion
- Insufficient strength of the maraging rods ?
- Local sensor to monitor the TM motion during assembly
Site work plan for the next week
- Mon: BS test hanging (Mark, Fabian, Zhao)
- Tue: BS test hanging (Mark, Fabian, Zhao)
- Wed: BS test hanging (Mark, Fabian, Zhao)
- Thu: BS test hanging (Mark, Fabian, Zhao)
- Fri: BS test hanging (Mark, Fabian, Zhao)
Travel Plans
- Travel (Week of 9/5):
- Takahashi:
- Shoda:
- Mark: 5 - 8
- Fabian: 5 - 8
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
- Travel (Week of 9/12):
- Takahashi:
- Shoda:
- Mark: 12 - 15
- Fabian: 12 - 15
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
Next meeting
2016/9/9(Fri) 13:30 - in Mitaka