Differences between revisions 5 and 6
Revision 5 as of 2016-09-15 13:16:00
Size: 3441
Editor: MarkBarton
Comment:
Revision 6 as of 2016-09-15 15:37:10
Size: 4433
Editor: AyakaShoda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 46: Line 46:
 * Put a report here  * Modification Parts
  * Structure Analysis is checked. The purchacing parts can be proceeded, while the method of a part of the analysis is not proper.
  * Wire dimensions for the BFRM is fixed as same as BF/IM maraging rod.
  * Waiting for the quatation with the proper format together with other additional orders.

 * Mirapro
  * Mirapro sent us a report about the optical bench wires. The top wires should be re-designed. Wires for PRs and BS will be ordered together.
  * Preparing for the order.

 * Mirror preparasion
  * 1st wire breakers for PRs is not found even in Kashiwa. They should be ordered together with new flags.
  * Made the rough jigs for removing the current flags from the PR3 and spare mirrors togher with Hirose-san.
   flag detaching will be done in November.

 * F7 LVDT
  * Magnetic coupling noise induced by the magnets on F7 LVDT is calculated with the same way of Shimoda-kun's calculation. (Only in length direction.)
   Current design is well enough for PRs.

Agenda/Minutes of the VIS Meeting on 2016/9/16

2016/9/16 13:30 - @ Room 210

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • EQ stop, release sensor, dummy payload: Open bidding was on 13th. Meet with the company person on 16th.
  • Bottom Filter: Assembly of BFs was started on 7th. Some of bearings washed previously were rusted.
  • BF damper: Specification document will be prepared with the drawings soon. Test of LVDT prototype is on going.
  • Maraging wire: Asking new design around head to ATC. Tensile test is in preparation.
  • Foot hold: Considering the type used in ATC, which is ready made and folded.

Type B Past Week Summary

  • Type B Past Week Summary
    • Fabian, Mark, Yokogawa-kun and Kuwahara-kun did BS installation at Kamioka:
      • Hung RM.
      • Did permanent routing of RM OSEM cables to IM.
      • Did temporary routing of RM OSEM in-vacuum cables to flange (4 channels).
      • Did semi-permanent routing of all OSEM external cables to satellite amps (10 channels)
      • Did temporary routing of RM OSEMs to PR2 rack (4 channels).
    • Hirata-san:
      • Finished 3D CAD of SR2 and SR3 in tanks, with optical layout included.
      • Started 3D CAD for SRM.
      • Checked flag design.
      • Assembled a bottom filter (ongoing).
      • Cleaned maraging rods.
  • Type B ongoing issues
  • Longer term to-do list
    • Do Inventor assembly for SRx in chamber and on assembly frame (Hirata) - SR2/SR3 DONE, SRM ongoing.
      • Part "disk security" top has to be modified - screw positions do not match.
    • Write more of payload assembly procedure (Fabian) - ONGOING
    • Write more of BS Assembly Procedure E1504235, E1504235 draft (Mark) - ONGOING

    • Lower breadboard installation to be incorporated into the procedure document.
    • Work on BS simulation (Fabian)
    • Do BS Simulink model (Mark, Kokeyama)
    • Do 2D drawings of SR2 parts (Hirata)
    • Redesign SRx IM wire clamps for larger prisms, remachined RMs
    • Order SRM/PRM parts (Hirata/Shoda)
    • Order SRx fasteners (Hirata)

Type-Bp (Shoda)

  • Modification Parts
    • Structure Analysis is checked. The purchacing parts can be proceeded, while the method of a part of the analysis is not proper.
    • Wire dimensions for the BFRM is fixed as same as BF/IM maraging rod.
    • Waiting for the quatation with the proper format together with other additional orders.
  • Mirapro
    • Mirapro sent us a report about the optical bench wires. The top wires should be re-designed. Wires for PRs and BS will be ordered together.
    • Preparing for the order.
  • Mirror preparasion
    • 1st wire breakers for PRs is not found even in Kashiwa. They should be ordered together with new flags.
    • Made the rough jigs for removing the current flags from the PR3 and spare mirrors togher with Hirose-san.
      • flag detaching will be done in November.
  • F7 LVDT
    • Magnetic coupling noise induced by the magnets on F7 LVDT is calculated with the same way of Shimoda-kun's calculation. (Only in length direction.)
      • Current design is well enough for PRs.

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Any issue ?

Discussion

  • Maraging and SUS rod issue follow up.
  • Temperature sensors on the suspensions ?

Site work plan for the next week

  • Mon:
  • Tue: BS clean booth cross-bar cutting (Aso)
  • Wed: BS clean booth cross-bar cutting (Aso)
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 9/19):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:
  • Travel (Week of 9/26):
    • Takahashi:
    • Shoda:
    • Mark: 26- 30
    • Fabian: 26- 30
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:

Next meeting

2016/9/30(Fri) 13:30 -

KAGRA/Subgroups/VIS/VISMinutes20160916 (last edited 2016-09-16 15:24:46 by YoichiAso)