Differences between revisions 1 and 2
Revision 1 as of 2016-09-28 11:57:17
Size: 1378
Editor: YoichiAso
Comment:
Revision 2 as of 2016-09-28 12:03:52
Size: 1602
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 27: Line 27:
 * Inspection report of the GAS blade from Virgo  * Inspection report of the GAS blade from Virgo (Takahashi)
Line 29: Line 29:
  * Which rods to be re-made ? (Takahashi)
  * Type-A rod neck diameter
 * IM OSEM noise issue (Shoda)
Line 33: Line 35:
 * Mon:
 * Tue: BS clean booth cross-bar cutting (Aso)
 * Wed: BS clean booth cross-bar cutting (Aso)
 * Thu:
 * Fri:
 * Mon: BS test hanging
 * Tue: BS test hanging
 * Wed: BS test hanging
 * Thu: BS test hanging
 * Fri: BS test hanging
Line 41: Line 43:
 * Travel (Week of 9/19):
  * Takahashi:
 * Travel (Week of 10/3):
  * Takahashi: 3(Akeno)
Line 44: Line 46:
  * Mark:
  * Fabian:
  * Mark: 3-7
  * Fabian: 3-7
Line 50: Line 52:
  * Sato:   * Sato: 3(Akeno)
Line 53: Line 55:
 * Travel (Week of 9/26):
  * Takahashi: 28 -30 (Accelerator check)
 * Travel (Week of 10/10):
  * Takahashi: 11 -14 (Extended Chief Meeting/Accelerator check)
Line 56: Line 58:
  * Mark: 26- 30
  * Fabian: 26- 30
  * Okutomi: 28 -30 (Accelerator check)
  * Mark: 11-14
  * Fabian: 11-14
  * Okutomi: 11 -14 (Extended Chief Meeting/Accelerator check/FE code development)
Line 62: Line 64:
  * Sato: 28 -30 (Accelerator check)   * Sato: 11 -14 (Extended Chief Meeting/Accelerator check)
Line 66: Line 68:
2016/9/30(Fri) 13:30 - 2016/10/7(Fri) 13:30 -

Agenda/Minutes of the VIS Meeting on 2016/9/30

2016/9/30 13:30 -

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Put a report here

Type B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Any issue ?

Discussion

  • Inspection report of the GAS blade from Virgo (Takahashi)
  • Maraging and SUS rod issue follow up.
    • Which rods to be re-made ? (Takahashi)
    • Type-A rod neck diameter
  • IM OSEM noise issue (Shoda)

Site work plan for the next week

  • Mon: BS test hanging
  • Tue: BS test hanging
  • Wed: BS test hanging
  • Thu: BS test hanging
  • Fri: BS test hanging

Travel Plans

  • Travel (Week of 10/3):
    • Takahashi: 3(Akeno)
    • Shoda:
    • Mark: 3-7
    • Fabian: 3-7
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato: 3(Akeno)
    • Ohishi:
  • Travel (Week of 10/10):
    • Takahashi: 11 -14 (Extended Chief Meeting/Accelerator check)
    • Shoda:
    • Mark: 11-14
    • Fabian: 11-14
    • Okutomi: 11 -14 (Extended Chief Meeting/Accelerator check/FE code development)
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato: 11 -14 (Extended Chief Meeting/Accelerator check)
    • Ohishi:

Next meeting

2016/10/7(Fri) 13:30 -

KAGRA/Subgroups/VIS/VISMinutes20160930 (last edited 2016-09-30 15:33:04 by YoichiAso)