Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2016-09-28 11:57:17
Size: 1378
Editor: YoichiAso
Comment:
Revision 3 as of 2016-09-29 17:51:14
Size: 2206
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
 * Put a report here  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes of Type-A Meeting]]
 * Pre-isolator: Pre-isolators will be assembled in ATC. IP+TF will be transported from Akeno on 3rd October.
 * EQ stop, release sensor, dummy payload: Production is on going. Met with the company person on 16th.
 * Bottom Filter: Assembly of the second BF is on going.
 * BF damper: Made the specification document with the drawings. Asking a quotation to a company. Actuator efficiency of LVDT prototype was measured.
 * Maraging wire: New design around head was shown by ATC. Tensile test is in preparation.
Line 27: Line 32:
 * Inspection report of the GAS blade from Virgo  * Inspection report of the GAS blade from Virgo (Takahashi)
Line 29: Line 34:
  * Which rods to be re-made ? (Takahashi)
  * Type-A rod neck diameter
 * IM OSEM noise issue (Shoda)
Line 33: Line 40:
 * Mon:
 * Tue: BS clean booth cross-bar cutting (Aso)
 * Wed: BS clean booth cross-bar cutting (Aso)
 * Thu:
 * Fri:
 * Mon: BS test hanging
 * Tue: BS test hanging
 * Wed: BS test hanging
 * Thu: BS test hanging
 * Fri: BS test hanging
Line 41: Line 48:
 * Travel (Week of 9/19):
  * Takahashi:
 * Travel (Week of 10/3):
  * Takahashi: 3(Akeno)
Line 44: Line 51:
  * Mark:
  * Fabian:
  * Mark: 3-7
  * Fabian: 3-7
Line 50: Line 57:
  * Sato:   * Sato: 3(Akeno)
Line 53: Line 60:
 * Travel (Week of 9/26):
  * Takahashi: 28 -30 (Accelerator check)
 * Travel (Week of 10/10):
  * Takahashi: 11 -14 (Extended Chief Meeting/Accelerator check)
Line 56: Line 63:
  * Mark: 26- 30
  * Fabian: 26- 30
  * Okutomi: 28 -30 (Accelerator check)
  * Mark: 11-14
  * Fabian: 11-14
  * Okutomi: 11 -14 (Extended Chief Meeting/Accelerator check/FE code development)
Line 62: Line 69:
  * Sato: 28 -30 (Accelerator check)   * Sato: 11 -14 (Extended Chief Meeting/Accelerator check)
Line 66: Line 73:
2016/9/30(Fri) 13:30 - 2016/10/7(Fri) 13:30 -

Agenda/Minutes of the VIS Meeting on 2016/9/30

2016/9/30 13:30 -

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Pre-isolator: Pre-isolators will be assembled in ATC. IP+TF will be transported from Akeno on 3rd October.
  • EQ stop, release sensor, dummy payload: Production is on going. Met with the company person on 16th.
  • Bottom Filter: Assembly of the second BF is on going.
  • BF damper: Made the specification document with the drawings. Asking a quotation to a company. Actuator efficiency of LVDT prototype was measured.
  • Maraging wire: New design around head was shown by ATC. Tensile test is in preparation.

Type B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Any issue ?

Discussion

  • Inspection report of the GAS blade from Virgo (Takahashi)
  • Maraging and SUS rod issue follow up.
    • Which rods to be re-made ? (Takahashi)
    • Type-A rod neck diameter
  • IM OSEM noise issue (Shoda)

Site work plan for the next week

  • Mon: BS test hanging
  • Tue: BS test hanging
  • Wed: BS test hanging
  • Thu: BS test hanging
  • Fri: BS test hanging

Travel Plans

  • Travel (Week of 10/3):
    • Takahashi: 3(Akeno)
    • Shoda:
    • Mark: 3-7
    • Fabian: 3-7
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato: 3(Akeno)
    • Ohishi:
  • Travel (Week of 10/10):
    • Takahashi: 11 -14 (Extended Chief Meeting/Accelerator check)
    • Shoda:
    • Mark: 11-14
    • Fabian: 11-14
    • Okutomi: 11 -14 (Extended Chief Meeting/Accelerator check/FE code development)
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato: 11 -14 (Extended Chief Meeting/Accelerator check)
    • Ohishi:

Next meeting

2016/10/7(Fri) 13:30 -