* Put a report here | * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes of Type-A Meeting]] * Pre-isolator: Started the assembly of pre-isolator in ATC. Measured the sensitivities of 3 ACCs at the site. * EQ stop, release sensor, dummy payload: Production is on going. * BF damper: The bidding was announced on 14th. Open bidding is on 9th November. * Maraging wire: Obuchi-san redesigned of the wire for Type-A with safety margin of 2. * Installation: Making assy. drawings. Designed the hoist tool. Consult with company. |
Line 60: | Line 66: |
On 2016/10/21(Fri) we will not have a meeting due to the preparation for the open day. However, people are asked to put progress reports. VIS F2F: Oct. 28, Nov. 18, Dec. 2 |
On 2016/10/28(Fri) F2F@Mitaka VIS F2F: Nov. 18, Dec. 2 |
VIS progress reports on 2016/10/21
Progress report
Type-A (Takahashi)
- Pre-isolator: Started the assembly of pre-isolator in ATC. Measured the sensitivities of 3 ACCs at the site.
- EQ stop, release sensor, dummy payload: Production is on going.
- BF damper: The bidding was announced on 14th. Open bidding is on 9th November.
- Maraging wire: Obuchi-san redesigned of the wire for Type-A with safety margin of 2.
- Installation: Making assy. drawings. Designed the hoist tool. Consult with company.
Type B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Any issue ?
Site work plan for the next week
- Mon: BS test hanging
- Tue: BS test hanging
- Wed: BS test hanging
- Thu: BS test hanging
- Fri:
Travel Plans
- Travel (Week of 10/24):
- Takahashi:
- Shoda:
- Mark: 24-27 (BS)
- Fabian: 24-27 (BS)
- Okutomi: 24-27 (PI realtime model development)
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
- Travel (Week of 10/31):
- Takahashi:
- Shoda:
- Mark: 31-11/4 (BS)
- Fabian: 31-11/3 (BS)
- Okutomi: 31-11/4 (PI realtime model development)
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
Next meeting
On 2016/10/28(Fri) F2F@Mitaka VIS F2F: Nov. 18, Dec. 2