Differences between revisions 4 and 5
Revision 4 as of 2016-10-20 12:30:58
Size: 2356
Editor: AyakaShoda
Comment:
Revision 5 as of 2016-10-20 12:31:18
Size: 2355
Editor: AyakaShoda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 18: Line 18:
  * BFRM  * BFRM

VIS progress reports on 2016/10/21

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Pre-isolator: Started the assembly of pre-isolator in ATC. Measured the sensitivities of 3 ACCs at the site.
  • EQ stop, release sensor, dummy payload: Production is on going.
  • BF damper: The bidding was announced on 14th. Open bidding is on 9th November.
  • Maraging wire: Obuchi-san redesigned of the wire for Type-A with safety margin of 2.
  • Installation: Making assy. drawings. Designed the hoist tool. Consult with company.

Type B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • BFRM
    • Still waiting for ordering process.
    • Maraging rod drawing is approved.
    • Some minor updates are done.
    • I and Saito-san agreed that the assembly test will be done in Mitaka.
  • Stab Flags
    • Hirata-san made the drawings. We will ask for the cost estimation soon.
  • Assembly frame
    • Asking cost estimate
  • Install procedure
    • I will draw some pictures how to install whole suspension chain into the chamber.
  • Flag removing jig.
    • Being late. Simon told me that it is safe to have the OSEM flags because of the circuits preparation.

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Any issue ?

Site work plan for the next week

  • Mon: BS test hanging
  • Tue: BS test hanging
  • Wed: BS test hanging
  • Thu: BS test hanging
  • Fri:

Travel Plans

  • Travel (Week of 10/24):
    • Takahashi:
    • Shoda:
    • Mark: 24-27 (BS)
    • Fabian: 24-27 (BS)
    • Okutomi: 24-27 (PI realtime model development)
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:
  • Travel (Week of 10/31):
    • Takahashi:
    • Shoda:
    • Mark: 31-11/4 (BS)
    • Fabian: 31-11/3 (BS)
    • Okutomi: 31-11/4 (PI realtime model development)
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Ohishi:

Next meeting

On 2016/10/28(Fri) F2F@Mitaka VIS F2F: Nov. 18, Dec. 2

KAGRA/Subgroups/VIS/VISMinutes20161021 (last edited 2016-10-27 12:47:26 by MarkBarton)