* Put a report here | * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes of Type-A Meeting]] * Installation: The review was held on 4th. * Pre-isolator: The new shaft screws of motor were delivered. They will be replaced. * EQ stop, release sensor, dummy payload: Production is on going. * BF damper: Open bidding is on 9th. * Maraging wire: New design was checked by CRY. Asking the company a quotation. |
Agenda/Minutes of the VIS Meeting on 2016/11/4
2016/11/4 13:30 -
Participants:
Progress report
Schedule Chart (PDF,MPP) To Be Updated
Type-A (Takahashi)
- Installation: The review was held on 4th.
- Pre-isolator: The new shaft screws of motor were delivered. They will be replaced.
- EQ stop, release sensor, dummy payload: Production is on going.
- BF damper: Open bidding is on 9th.
- Maraging wire: New design was checked by CRY. Asking the company a quotation.
Type B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Any issue ?
Discussion
- Any topics ?
Site work plan for the next week
- Mon: Accelerometer test, PR3 disassemble, Extended Chief Meeting
- Tue: BS Test Hanging, Accelerometer test, PR3 disassemble, Fire Drill
- Wed: BS Test Hanging, Accelerometer test, PR3 disassemble
- Thu: BS Test Hanging, PR3 disassemble
- Fri: BS Test Hanging, PR3 disassemble
Travel Plans
- Travel (Week of 11/7):
- Takahashi: 7-9 (Extended chief meeting/Fire drill/Accelerometer test)
- Shoda: 7-11 (Extended chief meeting/Fire drill/PR3 disassemble)
- Mark: 8 - 11 (Fire drill/BS)
- Fabian:
- Okutomi: 7 - 11 (Extended chief meeting/Fire drill/Accelerometer test/Realtime code)
- Fujii: ? (Fire drill)
- Ishizaki:
- Hirata: 8 - 11 (Fire drill/BS)
- Sato: 7-9 (Fire drill/Accelerometer test)
- Enzo: 8-11 (PR3 disassembly)
- Ohishi:
- Travel (Week of 11/14):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
Next meeting
On 2016/11/11(Fri)
VIS F2F: Nov. 18, Dec. 2