Differences between revisions 10 and 11
Revision 10 as of 2016-11-04 13:32:20
Size: 4954
Editor: YoichiAso
Comment:
Revision 11 as of 2016-11-04 13:41:18
Size: 4962
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
Participants: Takahashi, Okutomi, Tanaka, Mark, Aso, Ishizaki, Shoda, Sato, Fujii Participants: Takahashi, Okutomi, Tanaka, Mark, Aso, Ishizaki, Shoda, Sato, Fujii, Akutsu

Agenda/Minutes of the VIS Meeting on 2016/11/4

2016/11/4 13:30 -

Participants: Takahashi, Okutomi, Tanaka, Mark, Aso, Ishizaki, Shoda, Sato, Fujii, Akutsu

Progress report

Schedule Chart (PDF,MPP) To Be Updated

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Installation: The review was held on 4th.
  • Pre-isolator: The new shaft screws of motor were delivered. They will be replaced.
  • EQ stop, release sensor, dummy payload: Production is on going.
  • BF damper: Open bidding is on 9th.
  • Maraging wire: New design was checked by CRY. Asking the company a quotation.

Type B (Mark)

  • Type B Past Week Summary
    • Mark
      • Updated the BS circuit diagram D1503600:

        • Added information on the binary IO.
        • Renamed channels to conform to Okutomi-kun's new scheme.
        • Made the ADC/DAC channel assignment consistent and more logical.
        • Updated the stepper motor sections with info about the new driver chassis.
      • Worked on schedule.
      • Updated the installation procedure with lessons learned from the last few weeks.
      • Downloaded Hirata-san's Inventor model of the BS in the tank and starting thinking about installation of the suspension and lower bread board.
      • Mark and Hirata-san worked on collecting parts and tools that will be needed for cabling of the BS next week. (11 special-purpose cables need to be made for the picos/steppers/OSEMs/LVDT on the RM/IRM/IM/BF and, time permitting, 2 more for the SF.)
    • Hirata-san
      • Updated the BS 3D Assembly with the new rods and receptacles.
      • Made 2D drawings of SR2 and SR3 (ongoing).
      • Made SRM 3D assembly (ongoing)
      • Asked for and got quotes for hexagon cable clamps. Takahashi-san ordered the PEEK components. Next week Hirata-san will look for parts that should already be at Kamioka.
      • Washed screws for hexagon cable clamps and shim rings for Fabian.

Type-Bp (Shoda)

  • BFRM

    • The ordering process finished. We told the company to proceed the manufacturing. The detailed discussion with the company will be help at 14th 11:00-.
  • New flags

    • We have got the cost estimate. The ordering process is under discussion.
  • Flag removing jig

    • The design is fixed. The material will be bought by us and will be passed ATC to machine.
  • Cable/Magnets/Cranes

    • The number of the cables used for Type-Bp is checked. Passed information to Takahashi-san.
      The number is enough only for Type-Bp. I am not sure if Type-B and Type-A are included.
      Also we have got the cost estimate for the magnets. They will be ordered soon.
      The chain blocks and lever blocks will also be ordered soon.

  • Assembly frame

    • We have got the costestimate. We are asking for the competitive quotes.
  • OB related

    • We are going to order the OB related parts necessary in only this FY for now.
  • PR3 Disassembly

    • We are going to disassemble the iKAGRA PR3 from 9th. The mirror box and the perican box is sent to Kamioka.

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Design and preparation(investigation of procurement) for production.PDF

  • Will show the design at the next AEL meeting.--->Nov.14th.2016 15pm(Schedule of presentation for WDS.)

Safety

  • Any issue ?

Discussion

  • Any topics ?

Site work plan for the next week

  • Mon: Accelerometer test, PR3 disassemble, Extended Chief Meeting
  • Tue: BS Test Hanging, Accelerometer test, PR3 disassemble, Fire Drill
  • Wed: BS Test Hanging, Accelerometer test, PR3 disassemble
  • Thu: BS Test Hanging, PR3 disassemble
  • Fri: BS Test Hanging, PR3 disassemble

Travel Plans

  • Travel (Week of 11/7):
    • Takahashi: 7-9 (Extended chief meeting/Fire drill/Accelerometer test)
    • Shoda: 7-11 (Extended chief meeting/Fire drill/PR3 disassemble)
    • Mark: 8 - 11 (Fire drill/BS)
    • Fabian:
    • Okutomi: 7 - 11 (Extended chief meeting/Fire drill/Accelerometer test/Realtime code)
    • Fujii: ? (Fire drill)
    • Ishizaki:
    • Hirata: 8 - 11 (Fire drill/BS)
    • Sato: 7-9 (Fire drill/Accelerometer test)
    • Enzo: 8-11 (PR3 disassembly)
    • Ohishi:
  • Travel (Week of 11/14):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:

Next meeting

On 2016/11/11(Fri)

VIS F2F: Nov. 18, Dec. 2

KAGRA/Subgroups/VIS/VISMinutes20161104 (last edited 2016-11-10 17:10:39 by NobuyukiTanaka)