Line 29: Line 29:
 * Put a report here
 * Design and preparation(investigation of procurement) for production.[[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0057/E1605791/003/Project_WDS_H-W_Assignment_Design-Ver0_2-20161104.pdf|PDF]]
 *Will show the design at the next AEL meeting.--->Nov.14th.2016 15pm(Schedule of presentation for WDS.)

Agenda/Minutes of the VIS Meeting on 2016/11/4

2016/11/4 13:30 -

Participants:

Progress report

Schedule Chart (PDF,MPP) To Be Updated

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Installation: The review was held on 4th.
  • Pre-isolator: The new shaft screws of motor were delivered. They will be replaced.
  • EQ stop, release sensor, dummy payload: Production is on going.
  • BF damper: Open bidding is on 9th.
  • Maraging wire: New design was checked by CRY. Asking the company a quotation.

Type B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Design and preparation(investigation of procurement) for production.PDF

  • Will show the design at the next AEL meeting.--->Nov.14th.2016 15pm(Schedule of presentation for WDS.)

Safety

  • Any issue ?

Discussion

  • Any topics ?

Site work plan for the next week

  • Mon: Accelerometer test, PR3 disassemble, Extended Chief Meeting
  • Tue: BS Test Hanging, Accelerometer test, PR3 disassemble, Fire Drill
  • Wed: BS Test Hanging, Accelerometer test, PR3 disassemble
  • Thu: BS Test Hanging, PR3 disassemble
  • Fri: BS Test Hanging, PR3 disassemble

Travel Plans

  • Travel (Week of 11/7):
    • Takahashi: 7-9 (Extended chief meeting/Fire drill/Accelerometer test)
    • Shoda: 7-11 (Extended chief meeting/Fire drill/PR3 disassemble)
    • Mark: 8 - 11 (Fire drill/BS)
    • Fabian:
    • Okutomi: 7 - 11 (Extended chief meeting/Fire drill/Accelerometer test/Realtime code)
    • Fujii: ? (Fire drill)
    • Ishizaki:
    • Hirata: 8 - 11 (Fire drill/BS)
    • Sato: 7-9 (Fire drill/Accelerometer test)
    • Enzo: 8-11 (PR3 disassembly)
    • Ohishi:
  • Travel (Week of 11/14):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi: