Agenda/Minutes of the VIS Meeting on 2016/11/11
2016/11/11 13:30 -
Participants: Shoda, Kasuya, Akutsu, Mark, Hirata, Okutomi, Aso, Fujii, Sato, Ishizaki, Tanaka, Ohishi
Progress report
Schedule Chart (PDF,MPP) To Be Updated
Type-A (Takahashi)
- Installation: Asking a company the cost and schedule for transportation of Type-A items from the center area to the 2F of Y-end.
- Pre-isolator: Assembly work will be concentrated to the next week. The PI for SRs will be transported on 21st from Akeno. 5 ACCs were measured at the site.
- EQ stop, release sensor, dummy payload: Production is on going.
- BF damper: Open bidding was on 9th. A production company was decided.
- Maraging wire: Asking the company a quotation. The company is checking procurement of the material.
Type B (Mark)
- Type B Past Week Summary
- Mark and Hirata-san at Mitaka
- Gathered parts for cable making.
- Mark and Hirata-san at Kamioka:
- Replaced the floor panels that had been taken from the PR2 area (filling in the hole in the floor) and found/installed two new panels to act as bridges near the BS assembly frame.
- Installed two more LPCDs and the stepper motor driver in the PR2 rack.
- Ran cables from the rack to the second and third sat amps (for the IRM OSEMs).
- Added a second DIO card in the rack and connected it to the BIO inputs and outputs of the new LPCDs.
- Started making extension cables for RM-H2 and -H3 OSEMs but gave up due to complicated grounding arrangement.
- Washed four 40-cm D-Sub-9 ribbon cables to use as temporary extensions (maybe also for H1/H4).
- Added extension to the IM pico cable for the BF yaw pico.
- Made LVDT adapter cable.
- Mark worked on schedule.
- Mark and Hirata-san at Mitaka
Type-Bp (Shoda)
- Please put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
Schematic and PCB designJGW-E1605760-v2(PDF)
- Wearing a terminating resistor(for OSEM sensor deferential out) on both sides.
- And the value of terminating resistor is changed from 3k to 30k.
Design and preparation(investigation of procurement) for production.JGW-E1605791-v4(PDF)
Safety
- Any issue ?
- Foreseen risks
Discussion
- JPS/ASJ meetings
- PR3 accident
Site work plan for the next week
- Mon:
- Tue:
- Wed:
- Thu:
- Fri:
Travel Plans
- Travel (Week of 11/14):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
- Travel (Week of 11/21):
- Takahashi: 21 Akeno
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
Next meeting
On 2016/11/18(Fri) in Mitaka
VIS F2F: Nov. 18, Dec. 2