Differences between revisions 5 and 6
Revision 5 as of 2016-11-10 17:08:27
Size: 2067
Comment:
Revision 6 as of 2016-11-10 17:16:08
Size: 2363
Comment:
Deletions are marked like this. Additions are marked like this.
Line 29: Line 29:
 *  * Schematic and PCB design[[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0057/E1605760/002/Project_WDS_PCB_Design_Ver1-161110.pdf|JGW-E1605760-v2(PDF)]]
 * Wearing a terminating resistor(for OSEM sensor deferential out) on both sides.
   And the value of terminating resistor is changed from 3k to 30k.

Agenda/Minutes of the VIS Meeting on 2016/11/11

2016/11/11 13:30 -

Participants:

Progress report

Schedule Chart (PDF,MPP) To Be Updated

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Installation: Asking a company the cost and schedule for transportation of Type-A items from the center area to the 2F of Y-end.
  • Pre-isolator: Assembly work will be concentrated to the next week. The PI for SRs will be transported on 21st from Akeno. 5 ACCs were measured at the site.
  • EQ stop, release sensor, dummy payload: Production is on going.
  • BF damper: Open bidding was on 9th. A production company was decided.
  • Maraging wire: Asking the company a quotation. The company is checking procurement of the material.

Type B (Mark)

  • Please put a report here

Type-Bp (Shoda)

  • Please put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Schematic and PCB designJGW-E1605760-v2(PDF)

  • Wearing a terminating resistor(for OSEM sensor deferential out) on both sides.
    • And the value of terminating resistor is changed from 3k to 30k.
  • Design and preparation(investigation of procurement) for production.

JGW-E1605791-v4(PDF)

Safety

  • Any issue ?

Discussion

  • JPS/ASJ meetings

Site work plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 11/14):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:
  • Travel (Week of 11/21):
    • Takahashi: 21 Akeno
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:

Next meeting

On 2016/11/18(Fri) in Mitaka

VIS F2F: Nov. 18, Dec. 2

KAGRA/Subgroups/VIS/VISMinutes20161111 (last edited 2016-11-14 14:11:15 by AyakaShoda)