Line 26: Line 26:
 * Put a report here  * One od the TM flags was detached in the vacuum tank
   One of the TM flag (the one with small amout of the glue) was detached in the vacuum tank when we opened the flange.
   It was detached after we evacuate the tank and measured some transfer functions. It may be detatched naturally.
   The one with much glue is still surviving after the accident.
   It seems that the important thing for the flag on TM is amount of glue rather than shocks.
   (And we do not know how much Tatsumi-san put glue on them...)

 * Ordering
   Most of the things for PR3/2 are ordered. Now asking the delivery date.

 * Tools for installation into the vacuum
   Miyoki-san gave us the information of the chain blocks that can be used in the clean booth. It is expensive.
   Now I am asking to put the jacks on the inner frame together with the OB installation jigs.

 * Additional IM clamp
   should be ordered together with PRM/SRM payloads.

 * The EQ stops at Akeno
   should be cleaned. Takahashi-san is asking the cost estimation.

 * Flag removing
   Jigs will be delivered till Nov. 31th. Flag removing will be done on Dec. 1st.

 * Assembly frame
   Will be modified till Dec. 9th.

 * Assembly procedure lecture will be help on Nov. 24th 15:00-.

Agenda/Minutes of the VIS Meeting on 2016/11/18

2016/11/18 13:30 -

Participants:

Progress report

Schedule Chart (PDF,MPP) To Be Updated

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Installation: Asking a company the cost and schedule for transportation of Type-A items from the center area to the 2F of Y-end.
  • Pre-isolator: Mechanical assembly of two sets were finished. They will be shipped on 1st December.
    • The PI for SRs will be transported on 21st from Akeno. 6 ACCs were measured at the site.
  • EQ stop, release sensor, dummy payload: Production is on going.
  • BF damper: There was a meeting with the production company on 15th.
  • Maraging wire: Asking the company a quotation. The procurement of material was confirmed.
  • Tooling for installation: Main tools (foothold, chain block, lifer) were ordered. Still asking companies a quotation of the hoist tool.

Type B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • One od the TM flags was detached in the vacuum tank
    • One of the TM flag (the one with small amout of the glue) was detached in the vacuum tank when we opened the flange. It was detached after we evacuate the tank and measured some transfer functions. It may be detatched naturally. The one with much glue is still surviving after the accident. It seems that the important thing for the flag on TM is amount of glue rather than shocks. (And we do not know how much Tatsumi-san put glue on them...)
  • Ordering
    • Most of the things for PR3/2 are ordered. Now asking the delivery date.
  • Tools for installation into the vacuum
    • Miyoki-san gave us the information of the chain blocks that can be used in the clean booth. It is expensive. Now I am asking to put the jacks on the inner frame together with the OB installation jigs.
  • Additional IM clamp
    • should be ordered together with PRM/SRM payloads.
  • The EQ stops at Akeno
    • should be cleaned. Takahashi-san is asking the cost estimation.
  • Flag removing
    • Jigs will be delivered till Nov. 31th. Flag removing will be done on Dec. 1st.
  • Assembly frame
    • Will be modified till Dec. 9th.
  • Assembly procedure lecture will be help on Nov. 24th 15:00-.

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Incidents
  • Foreseen risks

Discussion

  • PR3 accident: future actions

Site work plan for the next week

  • Mon:
  • Tue:
  • Wed: BS
  • Thu: BS
  • Fri: BS

Travel Plans

  • Travel (Week of 11/14):
    • Takahashi:
    • Shoda:
    • Mark: 16-18
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata: 16-18
    • Sato:
    • Enzo: 16-18
    • Ohishi:
  • Travel (Week of 11/21):
    • Takahashi: 21 Akeno
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:
  • Long term travel plan
    • Takahashi: Dec. -> Mar.

    • Shoda: Dec. -> Mar.

    • Mark: Dec. -> Mar.

    • Fabian: Dec. -> Mar.

    • Okutomi: Dec. -> Mar.

    • Fujii:
    • Ishizaki: Dec. -> Mar.

    • Hirata: Dec. -> Mar.

    • Sato: Dec. -> Mar.

    • Enzo: Dec. -> Mar.

    • Ohishi:

Next meeting

On 2016/11/25(Fri)

VIS F2F: Dec. 2