Describe KAGRA/Subgroups/VIS/VISMinutes20161202 here. = Agenda/Minutes of the VIS Meeting on 2016/12/2 =

2016/12/2 13:30 -

Participants:

== Progress report ==
Schedule Chart ([[https://www.dropbox.com/s/4eg4yrl66h264so/VIS%20Overall%20Schedule-20161130.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/fskqtns6bzvw6k8/VIS%20Overall%20Schedule-20161130.mpp?dl=0|MPP]])

=== Type-A (Takahashi) ===
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes of Type-A Meeting]]
 * Installation: The first transportation to Y-end for Type-A items is scheduled on 7-9th. The second one is scheduled in early January.
 * Pre-isolator: Cable connection and check were finished. Two sets have been shipped on 1st.
 * EQ stop, release sensor, dummy payload: The parts remained will be delivered on 12th.
 * BF damper: The production is on going.
 * Maraging wire: Ordered. The first set will be delivered by 20th January.
 * Tooling for installation: The hoist tool was ordered.

=== Type B (Mark) ===
 * Put a report here

=== Type-Bp (Shoda) ===
 * Put a report here

=== IMMT (Ohishi) ===

 *Schedule
  * Most of the parts will be assembled and delivered to Kamioka on 28th Dec.
    (I will be taking winter holiday on 28th but I think I can chek it on 30th Dec.).

    * Dec 20th:Processing completion
    * Dec 21th-22th:Assembly
    * Dec 26th :Optional extra day
    * Dec 27th:Shipping

  * It depends on the mirror and jig status, but I think the mirror will be hung
    without magnets/standoff for initial alignment scheduled in January.
  * Hanging and installation will start from 4th January.
  * Two people from FCL are coming for hanging and installation till 12th January.

 * Mirror
  * Need to contacted with Hirose-san about the time when the mirrors are prepared.
   * IMMT1:
     Ø: 99.77 mm; Thickness at thinnest point: 51.76 mm; Wedge: 2.45°
   * IMMT2:
     Ø: 99.75 mm; Thickness at thinnest point: 52.93 mm; Wedge: 2.45°
   * Thickness of the mirrors are 1.17mm different.
 * Magnet and standoff fixture jig
  * Plan to modify MC jig
  * MC jig: perhaps still in Kashiwa.
  * Need at least two new parts and two sims for different thickness of the mirror.

 * Hanging jig
  * Now in Mitaka. Will be delivered to Kamioka by Tatsumi-san.

 * Drawings
  * Dropbox.

 * Remaining parts status
  * PZT holder: ask FCL to make quotation.
  * coil holders: drawings exist. need to check before ordering.
  * D-sub holders; We had two but now one of it was used for MCo.
    Need to make another one.

 * Hanging and Installation Procedure:
  * Because it is difficult to install IMMT2 from side flange,
    we are planning to install IMMT2 from the top flange.
  * Need discussion with Hirose-san about cleanliness control.
  * IMMTs are not on the center line where crane moves.
    So perhaps we need to move IMMT by hand after we install it from the top flange.
  * Prepare hanging and installation manual next week.

 * Place for hanging:
  * Unfortunately I could not have find breadboard legs.
  * Ask Kawamura-san if I can use small optical table that was used at MC recently replaced with larger optical bench.

 * Cables:
  * For initial alignment, planned in January, I think only Pico-motors will be necessary.
    (Coils will not be used for initial alignment.)
  * There already cables used when it was used for iKAGRA ETMs.
  * Check the place where cables are now; flippers are in branch office.
  * Check Flange

 * Digital models
  * Have not prepared yet.
  * IMMT picomotor drivers are located in Mozumi now.
  * Miyo-san said he already setup IP for IMMT drivers and will prepare network port in IOO rack next next week.
 
 * Others
  * Nippon Tungsten Company will give us sample of wires.
  * Pushers: Ask MIF to prepare it.
  * IMMT2 frame were modified to secure +/-1cm range for pico-motor.
    However, IMMT1 frame were not modified so the range is +/-5mm (originally).

=== Watchdog system (Tanaka) ===
 * Put a report here

=== Safety ===
 * Incidents:

 * Foreseen risks:

== Discussion ==

 * Mirror box modification

== Site work plan for the next week ==
 * Mon: BS
 * Tue: BS
 * Wed: BS/Type-A transportation
 * Thu: BS/Type-A transportation
 * Fri: BS/Type-A transportation

== Travel Plans ==


 * Travel (Week of 12/5):
  * Takahashi: 12/6-12/9
  * Shoda:
  * Mark: 12/5-12/9
  * Fabian: 12/5-12/9
  * Okutomi:
  * Fujii:
  * Ishizaki: 12/6-12/9
  * Hirata:
  * Sato:
  * Enzo: 12/5-12/9
  * Ohishi:

 * Travel (Week of 12/12):
  * Takahashi:
  * Shoda:
  * Mark:
  * Fabian:
  * Okutomi:
  * Fujii:
  * Ishizaki:
  * Hirata:
  * Sato:
  * Enzo:
  * Ohishi:


== Next meeting ==
On 2016/12/9(Fri)

Agenda/Minutes of the VIS Meeting on 2016/12/2

2016/12/2 13:30 -

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Installation: The first transportation to Y-end for Type-A items is scheduled on 7-9th. The second one is scheduled in early January.
  • Pre-isolator: Cable connection and check were finished. Two sets have been shipped on 1st.
  • EQ stop, release sensor, dummy payload: The parts remained will be delivered on 12th.
  • BF damper: The production is on going.
  • Maraging wire: Ordered. The first set will be delivered by 20th January.
  • Tooling for installation: The hoist tool was ordered.

Type B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Schedule
    • Most of the parts will be assembled and delivered to Kamioka on 28th Dec.
      • (I will be taking winter holiday on 28th but I think I can chek it on 30th Dec.).
      • Dec 20th:Processing completion
      • Dec 21th-22th:Assembly
      • Dec 26th :Optional extra day
      • Dec 27th:Shipping
    • It depends on the mirror and jig status, but I think the mirror will be hung
      • without magnets/standoff for initial alignment scheduled in January.
    • Hanging and installation will start from 4th January.
    • Two people from FCL are coming for hanging and installation till 12th January.
  • Mirror
    • Need to contacted with Hirose-san about the time when the mirrors are prepared.
      • IMMT1:
        • Ø: 99.77 mm; Thickness at thinnest point: 51.76 mm; Wedge: 2.45°
      • IMMT2:
        • Ø: 99.75 mm; Thickness at thinnest point: 52.93 mm; Wedge: 2.45°
      • Thickness of the mirrors are 1.17mm different.
  • Magnet and standoff fixture jig
    • Plan to modify MC jig
    • MC jig: perhaps still in Kashiwa.
    • Need at least two new parts and two sims for different thickness of the mirror.
  • Hanging jig
    • Now in Mitaka. Will be delivered to Kamioka by Tatsumi-san.
  • Drawings
    • Dropbox.
  • Remaining parts status
    • PZT holder: ask FCL to make quotation.
    • coil holders: drawings exist. need to check before ordering.
    • D-sub holders; We had two but now one of it was used for MCo.
      • Need to make another one.
  • Hanging and Installation Procedure:
    • Because it is difficult to install IMMT2 from side flange,
      • we are planning to install IMMT2 from the top flange.
    • Need discussion with Hirose-san about cleanliness control.
    • IMMTs are not on the center line where crane moves.
      • So perhaps we need to move IMMT by hand after we install it from the top flange.
    • Prepare hanging and installation manual next week.
  • Place for hanging:
    • Unfortunately I could not have find breadboard legs.
    • Ask Kawamura-san if I can use small optical table that was used at MC recently replaced with larger optical bench.
  • Cables:
    • For initial alignment, planned in January, I think only Pico-motors will be necessary.
      • (Coils will not be used for initial alignment.)
    • There already cables used when it was used for iKAGRA ETMs.
    • Check the place where cables are now; flippers are in branch office.
    • Check Flange
  • Digital models
    • Have not prepared yet.
    • IMMT picomotor drivers are located in Mozumi now.
    • Miyo-san said he already setup IP for IMMT drivers and will prepare network port in IOO rack next next week.
  • Others
    • Nippon Tungsten Company will give us sample of wires.
    • Pushers: Ask MIF to prepare it.
    • IMMT2 frame were modified to secure +/-1cm range for pico-motor.
      • However, IMMT1 frame were not modified so the range is +/-5mm (originally).

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Incidents:
  • Foreseen risks:

Discussion

  • Mirror box modification

Site work plan for the next week

  • Mon: BS
  • Tue: BS
  • Wed: BS/Type-A transportation
  • Thu: BS/Type-A transportation
  • Fri: BS/Type-A transportation

Travel Plans

  • Travel (Week of 12/5):
    • Takahashi: 12/6-12/9
    • Shoda:
    • Mark: 12/5-12/9
    • Fabian: 12/5-12/9
    • Okutomi:
    • Fujii:
    • Ishizaki: 12/6-12/9
    • Hirata:
    • Sato:
    • Enzo: 12/5-12/9
    • Ohishi:
  • Travel (Week of 12/12):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:

Next meeting

On 2016/12/9(Fri)