Differences between revisions 3 and 55 (spanning 52 versions)
Revision 3 as of 2016-11-30 13:52:23
Size: 6269
Editor: YoichiAso
Comment:
Revision 55 as of 2016-12-02 18:47:27
Size: 8377
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
Participants: Participants: Hirata, Takahashi, Okutomi, Shoda, Sato, Tanaka, Fujii, Enzo, Mark, Fabian, Aso, Raffaele, Akutsu
Line 12: Line 12:
 * Installation: Transportation of Type-A items was divided. The first transportation is scheduled on 7-9th December. The second one is scheduled in early January.
  We are asking to modify the piston system for the corn bellows to the company.
 * Pre-isolator: Two sets will be shipped on 1st December.
  The PIs for SR were transported on 21st from Akeno.
 * EQ stop, release sensor, dummy payload: Some parts have been delivered to Kamioka. The parts remained will be delivered on 12th December.
 * Installation: The first transportation to Y-end for Type-A items is scheduled on 7-9th. The second one is scheduled in early January.
 * Pre-isolator: Cable connection and check were finished. Two sets have been shipped on 1st.
 * EQ stop, release sensor, dummy payload: The parts remained will be delivered on 12th.
Line 18: Line 16:
 * Maraging wire: Asking UT ordering them. One set for the first Type-A system can be delivered by 20th January.
 * Tooling for installation: Still asking some companies a quotation of the hoist tool.
* '''Will update the schedule for December and January today (Takahashi)'''
 * Maraging wire: Ordered. The first set will be delivered by 20th January.
 * Tooling for installation: The hoist tool was ordered.
Line 23: Line 20:
 * Type B Past Week Summary
  * Mark (with Enzo) did initial TFs on the BF.
   * Did fixed-sine TFs on individual OSEMs at low frequency to check actuator polarity (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2176 | 2176]] and [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2182|2182]]).
   * Set gains in the COILOUTF block to compensate for actuator polarity.
  * Mark (with Enzo) did a free-swing measurement on the BS after earthquake of 11/22 (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2182|2182]]).
   * Results suspicious (noted by Shoda-san): too much difference between OSEMs - horizontal showing much less motion than vertical.
   * Possible rubbing in horizontal.
   * May need a trip to Kamioka.
  * Mark (with Enzo) made corrections and improvements to many of the MEDM screens (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2176 | 2176]] and [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=2182|2182]]).
   * Main overview screen was not generic in many places, and links to GDS_TP screens were broken.
   * ADC monitor screen referenced bad channels with LIGO-style names.
   * DAC monitor screen was not generic and did not support IM OSEMs.
   * Watchdog IM OSEM AC band limit filter screen was a copy of the TM one.
   * Watchdog TM OSEM AC band limit filter screen appears to be getting OL signals as input - needs model changes to fix.
   * The zoomed screens for IM OSEM centering were called incorrectly and did not work.
   * Various screens had LIGO-style channel names as labels.
  * Mark did a draft of D1603600-v12, including:
   * New assignment of IM OSEMs to DAQ channels (#4-9 are now V1, V2, V3, H1, H2, H3 rather than H1, H2, ...) from last Friday (the wiring was changed to reflect the model so as to remain consistent with PRx).
   * Information on how to identify the wires from the steppers and LVDTs so that the adapter cables can be plugged in properly.
  * Mark worked on schedule.
  * Hirata-san did drawings for new 8-mm maraging wires for Type A.
  * Hirata-san worked on PR/SR mirror box modifications with Shoda-san.
  * '''Update the schedule for the next 2 months immediately (Mark)'''
  * '''BS handling tool: find pictures/drawings of the iLIGO tool (Mark)'''
 * Mark worked on task lists and schedule.
 * Mark worked on an update of the BS Electronic Items doc ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5111|E1505111]]) and started a SRx Electronics Items doc ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5886|E1605886]]).
 * Mark did a summary spreadsheet of Takahashi-san's cable orders to see what needed to be ordered immediately (new BS TM OSEM cables; geophone adapters) and later (for SRx).
 * Mark worked on an update of the In-Vacuum Cable doc ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3901|E1503901]]), including information on final lengths that Fabian and Hirata-san had decided when making adapter cables.
 * Mark considered an alternative cabling scheme for the geophones (with a different adapter cable to put the signals and power on different lines and a matching unscrambler) but ended up concluding that the existing design would probably be OK. See [[attachment:00 Revised Geophone-v2.PDF]].
 * Fabian worked on a redesign of the EQ stops for the BS (2 of 4 screws under the RM are opposite large holes and there are no screws to restrain the RM front/back at either top or bottom).
 * Hirata-san worked on PR/SR mirror box modifications with Shoda-san (on-going).
 * Hirata-san partially assembled a bottom filter for use in fit tests of the PRx BF recoil mass.

 * '''Need to order geophones immediately (Takahashi)'''
Line 49: Line 32:
 * Type-Bp Test Hanging Schedule
  * The assembly lecture was held on Thursday.
  * Flag removing jig is almost ready. The removing will be done in Dec. 1st.
  * Stab flags and wire breakers will be deriverd at around Dec. 14th-16th. The hanging will start from the week of 19th.
   * '''Update the schedule with this delay included (Shoda)'''
  * Okutomi-kun can join us for the mirror hanging as another expert.
 * Installation preperation
  * Flag removing is postponed because we found that some of the parts are required to be re-manufactured. <<BR>>
   We will try again at 9th Dec.
  * New assembly frame will be constructed on 12th and 13th Dec.
  * Flag/Wire breaker glueing will be done on 15th and 16th Dec.
  * Hopefully, the mirror will be sent to Kamioka on 19th and we can start hanging from 20th Dec. (19th is extended chief MTG.)
Line 56: Line 39:
 * Mirror box modification
  * pictures
 * Design
  * For the installation of the main suspension chain, a clean chain block is ordered. Pararelly, removable jacks on the inner frame is being prepared.
  * 3D design of the mirror box modification is almost done. 2D drawings have to be prepared.

 * PR3 will be returned to Mitaka today. Need to transport it to Kashiwa.
Line 60: Line 46:
 * Most of the parts necessary for modification, 2D/3D drawings, cleaning, assembly, manpower for hanging and installation ordered.
 * Hanging and installation: scheduled 4th-6th and 10-12th January 2017.
 * Some small parts have not been ordered yet (safety stop, Pico-motor holder, coil holders).
 * Hanging jig: some missing parts will be ordered.
 * Magnet fixture jig: have not ordered yet.

 *Schedule
  * Most of the parts will be assembled and delivered to Kamioka on 28th Dec.
    * Dec 20th:Processing completion
    * Dec 21th-22th:Assembly
    * Dec 26th :Optional extra day
    * Dec 27th:Shipping

  * It depends on the mirror and jig status, but I think the mirror will be hung
    without magnets/standoff for initial alignment scheduled in January (Need to be confirmed).
   * '''We need to suspend the mirrors with magnets and standoffs. Will arrange with Hirose-san for the gluing work (Aso)'''
  * Hanging and installation will start from 4th January.
  * Two people from FCL are coming for hanging and installation till 12th January.

 * Mirror
  * Need to contacted with Hirose-san:
   * IMMT1:
     Ø: 99.77 mm; Thickness at thinnest point: 51.76 mm; Wedge: 2.45°
   * IMMT2:
     Ø: 99.75 mm; Thickness at thinnest point: 52.93 mm; Wedge: 2.45°
   * Thickness of the mirrors are 1.17mm different.
 * Magnet and standoff fixture jig
  * Plan to modify MC jig
  * MC jig: perhaps still in Kashiwa.
  * Need at least two new parts and two sims for different thickness of the mirror.

 * Hanging jig
  * Now in Mitaka. Will be delivered to Kamioka by Tatsumi-san.

 * Drawings
  * will be uploaded to dropbox.

 * Remaining parts status
  * PZT holder: asked FCL to make quotation.
  * coil holders: drawings exist. need to check before ordering.
  * D-sub holders; We had two holders but now one of it was used for MCo.
    Need to make another one.

 * Hanging and Installation Procedure:
  * Because it is difficult to install IMMT2 from side flange,
    we are planning to install IMMT2 from the top flange.
  * Need discussion with Hirose-san about cleanliness control.
  * IMMTs are not on the center line where crane moves.
    So perhaps we need to move IMMT by hand after we install it from the top flange.
  * Prepare hanging and installation manual next week.

 * Place for hanging:
  * Unfortunately I could not have find breadboard(GIF) legs.
  * Ask Kawamura-san if I can use small optical table that was used at MC recently replaced with larger optical bench.

 * Cables:
  * For initial alignment, planned in January, I think only Pico-motors will be necessary.
  (Need to be confirmed; Coils will not be used for initial alignment.)
  * There already cables used when it was used for iKAGRA ETMs.
  * Check the place where cables are now; flippers are in branch office.
  * Check Flange

 * Digital models
  * Have not prepared yet.
  * IMMT picomotor drivers are located in Mozumi now.
  * Miyo-san said he already setup IP for IMMT drivers and will prepare network port in IOO rack next next week.
 
 * Others
  * Nippon Tungsten Company will give us sample of wires.
  * Pushers: Ask MIF to prepare it.
  * IMMT2 frame were modified to secure +/-1cm range for pico-motor.
    However, IMMT1 frame were not modified so the range is +/-5mm (originally).
Line 67: Line 115:
 * Preparing for an experiment to test the heat design.  * Test on the central power supply shows that the regulator chip is over heated.
 * Preparing a test for a smaller power supply circuit put on each WD board.
Line 70: Line 119:
 * Incidents: no  * Incidents:
Line 72: Line 121:
 * Foreseen risks: make sure to unplug everything before the blackout.  * Foreseen risks:
  * BS: will avoid any dangerous work because there will be only two people
  * Type-A transportation: Carefully watch the company workers. Insist to handle the items carefully.
Line 76: Line 127:
 * PR3 accident: future actions
  * Modifications to the mirror box and the RM base (Shoda)
   * Shorter rod (38mm shorter)
   * Fixing the two slides together
   * Add pulling screws to the base of the RM
   * Fix the RM to the base using screws
   * Basic ideas seem good
   * '''Shoda and Hirata will make more concrete design so that the modification can be ready before the PR3 test hanging'''

  * Disassembly
   * We need to be prepared for accidents like the mirror wires break and the mirror being trapped in the RM
    * In this situation, we need to have a safe method to remove the mirror from the RM: we need to develop such a procedure and necessary tools
    * The same procedure can be used for the disassembly of healthy suspension as well.
    * We will continue to consider what kind of tools/jigs are necessary for this.
    * For the moment, the priority is on the design of the assembly jigs
 * Mirror box modification
  * Shoda-san showed the current design. Basically the design seems OK.
  * The modification of the mirror box (shorten the rods and modify the lids) is difficult to do quickly because mirrors are already in the boxes.
   * We will postpone the modification of the mirror box to after the test hanging is started
  * Other modifications (tying the sliders together, adding pulling screws to the RM base and adding fixing screws for the RM) will be performed before the test hanging starts.
  * '''Mark will send the RM base parts from Kamioka on Monday. Shoda-san will send Mark details of what to look for where'''.
  
Line 93: Line 136:
 * Mon:
 * Tue: Power outage preparation/recovery (Aso)
 * Wed:
 * Thu:
 * Fri: PI delivery
 * Mon: BS
 * Tue: BS
 * Wed: BS/Type-A transportation
 * Thu: BS/Type-A transportation
 * Fri: BS/Type-A transportation
Line 102: Line 145:
 * Travel (Week of 11/28):
  * Takahashi:
  * Shoda: 12/1 (Kashiwa)
  * Mark:
  * Fabian:
  * Okutomi:
  * Fujii:
  * Ishizaki: 12/1-2 (receive PI)
  * Hirata:
  * Sato:
  * Enzo:
  * Ohishi:
Line 117: Line 147:
  * Shoda:   * Shoda: 12/7-12/8 f2f, 12/9 Kashiwa
Line 120: Line 150:
  * Okutomi:
  * Fujii:
  * Okutomi: 12/7-12/8 f2f
  * Fujii: 12/7-12/8 f2f
Line 125: Line 155:
  * Enzo: 12/5-12/9   * Enzo: 12/7-12/8 f2f (Hongo)
  * Ohishi: 12/5-12/6 Hongo

 * Travel (Week of 12/12):
  * Takahashi:
  * Shoda: 12/12-13 Assembly frame, 12/15 or 16 (Kashiwa)
  * Mark: 12/12-12/16 (depending on BS vs SRx progress)
  * Fabian: 12/12-12/16
  * Okutomi:
  * Fujii: 12/15 or 16 (Kashiwa)
  * Ishizaki:
  * Hirata:
  * Sato:
  * Enzo: 12/12-12/16 (for Type B )
Line 130: Line 173:
On 2016/12/2(Fri) F2F in Mitaka On 2016/12/9(Fri)

Agenda/Minutes of the VIS Meeting on 2016/12/2

2016/12/2 13:30 -

Participants: Hirata, Takahashi, Okutomi, Shoda, Sato, Tanaka, Fujii, Enzo, Mark, Fabian, Aso, Raffaele, Akutsu

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Installation: The first transportation to Y-end for Type-A items is scheduled on 7-9th. The second one is scheduled in early January.
  • Pre-isolator: Cable connection and check were finished. Two sets have been shipped on 1st.
  • EQ stop, release sensor, dummy payload: The parts remained will be delivered on 12th.
  • BF damper: The production is on going.
  • Maraging wire: Ordered. The first set will be delivered by 20th January.
  • Tooling for installation: The hoist tool was ordered.

Type B (Mark)

  • Mark worked on task lists and schedule.
  • Mark worked on an update of the BS Electronic Items doc (E1505111) and started a SRx Electronics Items doc (E1605886).

  • Mark did a summary spreadsheet of Takahashi-san's cable orders to see what needed to be ordered immediately (new BS TM OSEM cables; geophone adapters) and later (for SRx).
  • Mark worked on an update of the In-Vacuum Cable doc (E1503901), including information on final lengths that Fabian and Hirata-san had decided when making adapter cables.

  • Mark considered an alternative cabling scheme for the geophones (with a different adapter cable to put the signals and power on different lines and a matching unscrambler) but ended up concluding that the existing design would probably be OK. See 00 Revised Geophone-v2.PDF.

  • Fabian worked on a redesign of the EQ stops for the BS (2 of 4 screws under the RM are opposite large holes and there are no screws to restrain the RM front/back at either top or bottom).
  • Hirata-san worked on PR/SR mirror box modifications with Shoda-san (on-going).
  • Hirata-san partially assembled a bottom filter for use in fit tests of the PRx BF recoil mass.
  • Need to order geophones immediately (Takahashi)

Type-Bp (Shoda)

  • Installation preperation
    • Flag removing is postponed because we found that some of the parts are required to be re-manufactured.

      • We will try again at 9th Dec.
    • New assembly frame will be constructed on 12th and 13th Dec.
    • Flag/Wire breaker glueing will be done on 15th and 16th Dec.
    • Hopefully, the mirror will be sent to Kamioka on 19th and we can start hanging from 20th Dec. (19th is extended chief MTG.)
  • Design
    • For the installation of the main suspension chain, a clean chain block is ordered. Pararelly, removable jacks on the inner frame is being prepared.
    • 3D design of the mirror box modification is almost done. 2D drawings have to be prepared.
  • PR3 will be returned to Mitaka today. Need to transport it to Kashiwa.

IMMT (Ohishi)

  • Schedule
    • Most of the parts will be assembled and delivered to Kamioka on 28th Dec.
      • Dec 20th:Processing completion
      • Dec 21th-22th:Assembly
      • Dec 26th :Optional extra day
      • Dec 27th:Shipping
    • It depends on the mirror and jig status, but I think the mirror will be hung
      • without magnets/standoff for initial alignment scheduled in January (Need to be confirmed).
      • We need to suspend the mirrors with magnets and standoffs. Will arrange with Hirose-san for the gluing work (Aso)

    • Hanging and installation will start from 4th January.
    • Two people from FCL are coming for hanging and installation till 12th January.
  • Mirror
    • Need to contacted with Hirose-san:
      • IMMT1:
        • Ø: 99.77 mm; Thickness at thinnest point: 51.76 mm; Wedge: 2.45°
      • IMMT2:
        • Ø: 99.75 mm; Thickness at thinnest point: 52.93 mm; Wedge: 2.45°
      • Thickness of the mirrors are 1.17mm different.
  • Magnet and standoff fixture jig
    • Plan to modify MC jig
    • MC jig: perhaps still in Kashiwa.
    • Need at least two new parts and two sims for different thickness of the mirror.
  • Hanging jig
    • Now in Mitaka. Will be delivered to Kamioka by Tatsumi-san.
  • Drawings
    • will be uploaded to dropbox.
  • Remaining parts status
    • PZT holder: asked FCL to make quotation.
    • coil holders: drawings exist. need to check before ordering.
    • D-sub holders; We had two holders but now one of it was used for MCo.
      • Need to make another one.
  • Hanging and Installation Procedure:
    • Because it is difficult to install IMMT2 from side flange,
      • we are planning to install IMMT2 from the top flange.
    • Need discussion with Hirose-san about cleanliness control.
    • IMMTs are not on the center line where crane moves.
      • So perhaps we need to move IMMT by hand after we install it from the top flange.
    • Prepare hanging and installation manual next week.
  • Place for hanging:
    • Unfortunately I could not have find breadboard(GIF) legs.
    • Ask Kawamura-san if I can use small optical table that was used at MC recently replaced with larger optical bench.
  • Cables:
    • For initial alignment, planned in January, I think only Pico-motors will be necessary. (Need to be confirmed; Coils will not be used for initial alignment.)
    • There already cables used when it was used for iKAGRA ETMs.
    • Check the place where cables are now; flippers are in branch office.
    • Check Flange
  • Digital models
    • Have not prepared yet.
    • IMMT picomotor drivers are located in Mozumi now.
    • Miyo-san said he already setup IP for IMMT drivers and will prepare network port in IOO rack next next week.
  • Others
    • Nippon Tungsten Company will give us sample of wires.
    • Pushers: Ask MIF to prepare it.
    • IMMT2 frame were modified to secure +/-1cm range for pico-motor.
      • However, IMMT1 frame were not modified so the range is +/-5mm (originally).

Watchdog system (Tanaka)

  • Test on the central power supply shows that the regulator chip is over heated.
  • Preparing a test for a smaller power supply circuit put on each WD board.

Safety

  • Incidents:
  • Foreseen risks:
    • BS: will avoid any dangerous work because there will be only two people
    • Type-A transportation: Carefully watch the company workers. Insist to handle the items carefully.

Discussion

  • Mirror box modification
    • Shoda-san showed the current design. Basically the design seems OK.
    • The modification of the mirror box (shorten the rods and modify the lids) is difficult to do quickly because mirrors are already in the boxes.
      • We will postpone the modification of the mirror box to after the test hanging is started
    • Other modifications (tying the sliders together, adding pulling screws to the RM base and adding fixing screws for the RM) will be performed before the test hanging starts.
    • Mark will send the RM base parts from Kamioka on Monday. Shoda-san will send Mark details of what to look for where.

Site work plan for the next week

  • Mon: BS
  • Tue: BS
  • Wed: BS/Type-A transportation
  • Thu: BS/Type-A transportation
  • Fri: BS/Type-A transportation

Travel Plans

  • Travel (Week of 12/5):
    • Takahashi: 12/6-12/9
    • Shoda: 12/7-12/8 f2f, 12/9 Kashiwa
    • Mark: 12/5-12/9
    • Fabian: 12/5-12/9
    • Okutomi: 12/7-12/8 f2f
    • Fujii: 12/7-12/8 f2f
    • Ishizaki: 12/6-12/9
    • Hirata:
    • Sato:
    • Enzo: 12/7-12/8 f2f (Hongo)
    • Ohishi: 12/5-12/6 Hongo
  • Travel (Week of 12/12):
    • Takahashi:
    • Shoda: 12/12-13 Assembly frame, 12/15 or 16 (Kashiwa)
    • Mark: 12/12-12/16 (depending on BS vs SRx progress)
    • Fabian: 12/12-12/16
    • Okutomi:
    • Fujii: 12/15 or 16 (Kashiwa)
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo: 12/12-12/16 (for Type B )
    • Ohishi:

Next meeting

On 2016/12/9(Fri)

KAGRA/Subgroups/VIS/VISMinutes20161202 (last edited 2016-12-02 18:47:27 by YoichiAso)