* Inside the IFI chamber, there is large IFI; it is so crowded and seems to be difficult installing IMMT suspension from the side flange. * We are planning to install IMMT2 from the top flange. |
* Because it is difficult to install IMMT2 from side flange, we are planning to install IMMT2 from the top flange. |
Line 70: | Line 69: |
* IMMTs are not on the center line where cranes move. | * IMMTs are not on the center line where crane moves. |
Line 91: | Line 90: |
* Pushers | * Pushers: Ask MIF to prepare it. |
Agenda/Minutes of the VIS Meeting on 2016/12/2
2016/12/2 13:30 -
Participants:
Progress report
Type-A (Takahashi)
- Installation: The first transportation to Y-end for Type-A items is scheduled on 7-9th. The second one is scheduled in early January.
- Pre-isolator: Cable connection and check were finished. Two sets have been shipped on 1st.
- EQ stop, release sensor, dummy payload: The parts remained will be delivered on 12th.
- BF damper: The production is on going.
- Maraging wire: Ordered. The first set will be delivered by 20th January.
- Tooling for installation: The hoist tool was ordered.
Type B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Schedule
- Most of the parts will be assembled and delivered to Kamioka on 28th Dec.
- (I will be taking winter holiday on 28th but I think I can chek it on 30th Dec.).
- Dec 20th:Processing completion
- Dec 21th-22th:Assembly
- Dec 26th :Optional extra day
- Dec 27th:Shipping
- It depends on the mirror and jig status, but I think the mirror will be hung
- without magnets/standoff for initial alignment scheduled in January.
- Hanging and installation will start from 4th January.
- Two people from FCL are coming for hanging and installation till 12th January.
- Most of the parts will be assembled and delivered to Kamioka on 28th Dec.
- Mirror
- Need to contacted with Hirose-san about the time when the mirrors are prepared.
- IMMT1:
- Ø: 99.77 mm; Thickness at thinnest point: 51.76 mm; Wedge: 2.45°
- IMMT2:
- Ø: 99.75 mm; Thickness at thinnest point: 52.93 mm; Wedge: 2.45°
- Thickness of the mirrors are 1.17mm different.
- IMMT1:
- Need to contacted with Hirose-san about the time when the mirrors are prepared.
- Magnet and standoff fixture jig
- Plan to modify MC jig
- MC jig: perhaps still in Kashiwa.
- Need at least two new parts and two sims for different thickness of the mirror.
- Hanging jig
- Now in Mitaka. Will be delivered to Kamioka by Tatsumi-san.
- Drawings
- Dropbox.
- Remaining parts status
- PZT holder: ask FCL to make quotation.
- coil holders: drawings exist. need to check before ordering.
- D-sub holders; We had two but now one of it was used for MCo.
- Need to make another one.
- Hanging and Installation Procedure:
- Because it is difficult to install IMMT2 from side flange,
- we are planning to install IMMT2 from the top flange.
- Need discussion with Hirose-san about cleanliness control.
- IMMTs are not on the center line where crane moves.
- So perhaps we need to move IMMT by hand after we install it from the top flange.
- Because it is difficult to install IMMT2 from side flange,
- Place for hanging:
- Unfortunately I could not have find breadboard legs.
- Ask Kawamura-san if I can use small optical table that was used at MC recently replaced with larger optical bench.
- Cables:
- For initial alignment, planned in January, I think only Pico-motors will be necessary.
- (Coils will not be used for initial alignment.)
- There already cables used when it was used for iKAGRA ETMs.
- Check the place where cables are now; flippers are in branch office.
- Check Flange
- For initial alignment, planned in January, I think only Pico-motors will be necessary.
- Digital models
- Have not prepared yet.
- IMMT picomotor drivers are located in Mozumi now.
- Miyo-san said he already setup IP for IMMT drivers and will prepare network port in IOO lack next next week.
- Others
- Nippon Tungsten Company will give us sample of wires.
- Pushers: Ask MIF to prepare it.
Watchdog system (Tanaka)
- Put a report here
Safety
- Incidents:
- Foreseen risks:
Discussion
- Mirror box modification
Site work plan for the next week
- Mon: BS
- Tue: BS
- Wed: BS/Type-A transportation
- Thu: BS/Type-A transportation
- Fri: BS/Type-A transportation
Travel Plans
- Travel (Week of 12/5):
- Takahashi: 12/6-12/9
- Shoda:
- Mark: 12/5-12/9
- Fabian: 12/5-12/9
- Okutomi:
- Fujii:
- Ishizaki: 12/6-12/9
- Hirata:
- Sato:
- Enzo: 12/5-12/9
- Ohishi:
- Travel (Week of 12/12):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
Next meeting
On 2016/12/9(Fri)