Differences between revisions 50 and 55 (spanning 5 versions)
Revision 50 as of 2016-12-02 11:04:06
Size: 6892
Editor: NaokoOhishi
Comment:
Revision 55 as of 2016-12-02 18:47:27
Size: 8377
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
Participants: Participants: Hirata, Takahashi, Okutomi, Shoda, Sato, Tanaka, Fujii, Enzo, Mark, Fabian, Aso, Raffaele, Akutsu
Line 29: Line 29:
 * '''Need to order geophones immediately (Takahashi)'''
Line 41: Line 43:
 * PR3 will be returned to Mitaka today. Need to transport it to Kashiwa.
Line 51: Line 55:
    without magnets/standoff for initial alignment scheduled in January.     without magnets/standoff for initial alignment scheduled in January (Need to be confirmed).
   * '''We need to suspend the mirrors with magnets and standoffs. Will arrange with Hirose-san for the gluing work (Aso)'''
Line 56: Line 61:
  * Need to contacted with Hirose-san about the time when the mirrors are prepared.   * Need to contacted with Hirose-san:
Line 71: Line 76:
  * Dropbox.   * will be uploaded to dropbox.
Line 74: Line 79:
  * PZT holder: ask FCL to make quotation.   * PZT holder: asked FCL to make quotation.
Line 76: Line 81:
  * D-sub holders; We had two but now one of it was used for MCo.   * D-sub holders; We had two holders but now one of it was used for MCo.
Line 88: Line 93:
  * Unfortunately I could not have find breadboard legs.   * Unfortunately I could not have find breadboard(GIF) legs.
Line 92: Line 97:
  * For initial alignment, planned in January, I think only Pico-motors will be necessary.
    (Coils will not be used for initial alignment.)
  * For initial alignment, planned in January, I think only Pico-motors will be necessary. 
  (Need to be confirmed; Coils will not be used for initial alignment.)
Line 110: Line 115:
 * Put a report here  * Test on the central power supply shows that the regulator chip is over heated.
 * Preparing a test for a smaller power supply circuit put on each WD board.
Line 116: Line 122:
  * BS: will avoid any dangerous work because there will be only two people
  * Type-A transportation: Carefully watch the company workers. Insist to handle the items carefully.
Line 120: Line 128:
  * Shoda-san showed the current design. Basically the design seems OK.
  * The modification of the mirror box (shorten the rods and modify the lids) is difficult to do quickly because mirrors are already in the boxes.
   * We will postpone the modification of the mirror box to after the test hanging is started
  * Other modifications (tying the sliders together, adding pulling screws to the RM base and adding fixing screws for the RM) will be performed before the test hanging starts.
  * '''Mark will send the RM base parts from Kamioka on Monday. Shoda-san will send Mark details of what to look for where'''.
  
Line 133: Line 147:
  * Shoda:   * Shoda: 12/7-12/8 f2f, 12/9 Kashiwa
Line 136: Line 150:
  * Okutomi:
  * Fujii:
  * Okutomi: 12/7-12/8 f2f
  * Fujii: 12/7-12/8 f2f
Line 142: Line 156:
  * Ohishi:   * Ohishi: 12/5-12/6 Hongo
Line 146: Line 160:
  * Shoda:   * Shoda: 12/12-13 Assembly frame, 12/15 or 16 (Kashiwa)
Line 150: Line 164:
  * Fujii:   * Fujii: 12/15 or 16 (Kashiwa)
Line 154: Line 168:
  * Enzo: 12/12-12/16 (for Type B)   * Enzo: 12/12-12/16 (for Type B )

Agenda/Minutes of the VIS Meeting on 2016/12/2

2016/12/2 13:30 -

Participants: Hirata, Takahashi, Okutomi, Shoda, Sato, Tanaka, Fujii, Enzo, Mark, Fabian, Aso, Raffaele, Akutsu

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Installation: The first transportation to Y-end for Type-A items is scheduled on 7-9th. The second one is scheduled in early January.
  • Pre-isolator: Cable connection and check were finished. Two sets have been shipped on 1st.
  • EQ stop, release sensor, dummy payload: The parts remained will be delivered on 12th.
  • BF damper: The production is on going.
  • Maraging wire: Ordered. The first set will be delivered by 20th January.
  • Tooling for installation: The hoist tool was ordered.

Type B (Mark)

  • Mark worked on task lists and schedule.
  • Mark worked on an update of the BS Electronic Items doc (E1505111) and started a SRx Electronics Items doc (E1605886).

  • Mark did a summary spreadsheet of Takahashi-san's cable orders to see what needed to be ordered immediately (new BS TM OSEM cables; geophone adapters) and later (for SRx).
  • Mark worked on an update of the In-Vacuum Cable doc (E1503901), including information on final lengths that Fabian and Hirata-san had decided when making adapter cables.

  • Mark considered an alternative cabling scheme for the geophones (with a different adapter cable to put the signals and power on different lines and a matching unscrambler) but ended up concluding that the existing design would probably be OK. See 00 Revised Geophone-v2.PDF.

  • Fabian worked on a redesign of the EQ stops for the BS (2 of 4 screws under the RM are opposite large holes and there are no screws to restrain the RM front/back at either top or bottom).
  • Hirata-san worked on PR/SR mirror box modifications with Shoda-san (on-going).
  • Hirata-san partially assembled a bottom filter for use in fit tests of the PRx BF recoil mass.
  • Need to order geophones immediately (Takahashi)

Type-Bp (Shoda)

  • Installation preperation
    • Flag removing is postponed because we found that some of the parts are required to be re-manufactured.

      • We will try again at 9th Dec.
    • New assembly frame will be constructed on 12th and 13th Dec.
    • Flag/Wire breaker glueing will be done on 15th and 16th Dec.
    • Hopefully, the mirror will be sent to Kamioka on 19th and we can start hanging from 20th Dec. (19th is extended chief MTG.)
  • Design
    • For the installation of the main suspension chain, a clean chain block is ordered. Pararelly, removable jacks on the inner frame is being prepared.
    • 3D design of the mirror box modification is almost done. 2D drawings have to be prepared.
  • PR3 will be returned to Mitaka today. Need to transport it to Kashiwa.

IMMT (Ohishi)

  • Schedule
    • Most of the parts will be assembled and delivered to Kamioka on 28th Dec.
      • Dec 20th:Processing completion
      • Dec 21th-22th:Assembly
      • Dec 26th :Optional extra day
      • Dec 27th:Shipping
    • It depends on the mirror and jig status, but I think the mirror will be hung
      • without magnets/standoff for initial alignment scheduled in January (Need to be confirmed).
      • We need to suspend the mirrors with magnets and standoffs. Will arrange with Hirose-san for the gluing work (Aso)

    • Hanging and installation will start from 4th January.
    • Two people from FCL are coming for hanging and installation till 12th January.
  • Mirror
    • Need to contacted with Hirose-san:
      • IMMT1:
        • Ø: 99.77 mm; Thickness at thinnest point: 51.76 mm; Wedge: 2.45°
      • IMMT2:
        • Ø: 99.75 mm; Thickness at thinnest point: 52.93 mm; Wedge: 2.45°
      • Thickness of the mirrors are 1.17mm different.
  • Magnet and standoff fixture jig
    • Plan to modify MC jig
    • MC jig: perhaps still in Kashiwa.
    • Need at least two new parts and two sims for different thickness of the mirror.
  • Hanging jig
    • Now in Mitaka. Will be delivered to Kamioka by Tatsumi-san.
  • Drawings
    • will be uploaded to dropbox.
  • Remaining parts status
    • PZT holder: asked FCL to make quotation.
    • coil holders: drawings exist. need to check before ordering.
    • D-sub holders; We had two holders but now one of it was used for MCo.
      • Need to make another one.
  • Hanging and Installation Procedure:
    • Because it is difficult to install IMMT2 from side flange,
      • we are planning to install IMMT2 from the top flange.
    • Need discussion with Hirose-san about cleanliness control.
    • IMMTs are not on the center line where crane moves.
      • So perhaps we need to move IMMT by hand after we install it from the top flange.
    • Prepare hanging and installation manual next week.
  • Place for hanging:
    • Unfortunately I could not have find breadboard(GIF) legs.
    • Ask Kawamura-san if I can use small optical table that was used at MC recently replaced with larger optical bench.
  • Cables:
    • For initial alignment, planned in January, I think only Pico-motors will be necessary. (Need to be confirmed; Coils will not be used for initial alignment.)
    • There already cables used when it was used for iKAGRA ETMs.
    • Check the place where cables are now; flippers are in branch office.
    • Check Flange
  • Digital models
    • Have not prepared yet.
    • IMMT picomotor drivers are located in Mozumi now.
    • Miyo-san said he already setup IP for IMMT drivers and will prepare network port in IOO rack next next week.
  • Others
    • Nippon Tungsten Company will give us sample of wires.
    • Pushers: Ask MIF to prepare it.
    • IMMT2 frame were modified to secure +/-1cm range for pico-motor.
      • However, IMMT1 frame were not modified so the range is +/-5mm (originally).

Watchdog system (Tanaka)

  • Test on the central power supply shows that the regulator chip is over heated.
  • Preparing a test for a smaller power supply circuit put on each WD board.

Safety

  • Incidents:
  • Foreseen risks:
    • BS: will avoid any dangerous work because there will be only two people
    • Type-A transportation: Carefully watch the company workers. Insist to handle the items carefully.

Discussion

  • Mirror box modification
    • Shoda-san showed the current design. Basically the design seems OK.
    • The modification of the mirror box (shorten the rods and modify the lids) is difficult to do quickly because mirrors are already in the boxes.
      • We will postpone the modification of the mirror box to after the test hanging is started
    • Other modifications (tying the sliders together, adding pulling screws to the RM base and adding fixing screws for the RM) will be performed before the test hanging starts.
    • Mark will send the RM base parts from Kamioka on Monday. Shoda-san will send Mark details of what to look for where.

Site work plan for the next week

  • Mon: BS
  • Tue: BS
  • Wed: BS/Type-A transportation
  • Thu: BS/Type-A transportation
  • Fri: BS/Type-A transportation

Travel Plans

  • Travel (Week of 12/5):
    • Takahashi: 12/6-12/9
    • Shoda: 12/7-12/8 f2f, 12/9 Kashiwa
    • Mark: 12/5-12/9
    • Fabian: 12/5-12/9
    • Okutomi: 12/7-12/8 f2f
    • Fujii: 12/7-12/8 f2f
    • Ishizaki: 12/6-12/9
    • Hirata:
    • Sato:
    • Enzo: 12/7-12/8 f2f (Hongo)
    • Ohishi: 12/5-12/6 Hongo
  • Travel (Week of 12/12):
    • Takahashi:
    • Shoda: 12/12-13 Assembly frame, 12/15 or 16 (Kashiwa)
    • Mark: 12/12-12/16 (depending on BS vs SRx progress)
    • Fabian: 12/12-12/16
    • Okutomi:
    • Fujii: 12/15 or 16 (Kashiwa)
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo: 12/12-12/16 (for Type B )
    • Ohishi:

Next meeting

On 2016/12/9(Fri)

KAGRA/Subgroups/VIS/VISMinutes20161202 (last edited 2016-12-02 18:47:27 by YoichiAso)