Line 12: Line 12:
 * Installation: The first transportation to Y-end of Type-A items is scheduled on 7-9th. The second one is scheduled in early January.  * Installation: The first transportation to Y-end for Type-A items is scheduled on 7-9th. The second one is scheduled in early January.

Agenda/Minutes of the VIS Meeting on 2016/12/2

2016/12/2 13:30 -

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Installation: The first transportation to Y-end for Type-A items is scheduled on 7-9th. The second one is scheduled in early January.
  • Pre-isolator: Cable connection and check were finished. Two sets have been shipped on 1st.
  • EQ stop, release sensor, dummy payload: The parts remained will be delivered on 12th.
  • BF damper: The production is on going.
  • Maraging wire: Ordered. The first set will be delivered by 20th January.
  • Tooling for installation: The hoist tool was ordered.

Type B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Incidents:
  • Foreseen risks:

Discussion

  • Mirror box modification

Site work plan for the next week

  • Mon: BS
  • Tue: BS
  • Wed: BS/Type-A transportation
  • Thu: BS/Type-A transportation
  • Fri: BS/Type-A transportation

Travel Plans

  • Travel (Week of 12/5):
    • Takahashi: 12/6-12/9
    • Shoda:
    • Mark: 12/5-12/9
    • Fabian: 12/5-12/9
    • Okutomi:
    • Fujii:
    • Ishizaki: 12/6-12/9
    • Hirata:
    • Sato:
    • Enzo: 12/5-12/9
    • Ohishi:
  • Travel (Week of 12/12):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:

Next meeting

On 2016/12/9(Fri)