* Put a report here | * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes of Type-A Meeting]] * Transportation: The second transportation for EQ stot parts and tools is scheduled in 10-11th for Kamioka and 12-13th for Y-end in January. * EXV chamber: Connection of the top chamber is scheduled in 21st-22nd. TMP, cone bellows, and cross tubes will be assembled. * Pre-isolator: The assembly of two pre-isolators for SR is on going in ATC. * EQ stop, release sensor, dummy payload: The remain parts were delivered on 12th. * BF damper: The production is on going. * Maraging wire: The production is on going. * Tooling for installation: The support frame for the PI was delivered and assembled. The fiber scope will be ordered. |
Agenda/Minutes of the VIS Meeting on 2016/12/16
2016/12/16 13:30 -
Participants:
Progress report
Schedule Chart (PDF,MPP) (To Be Updated)
Type-A (Takahashi)
- Transportation: The second transportation for EQ stot parts and tools is scheduled in 10-11th for Kamioka and 12-13th for Y-end in January.
- EXV chamber: Connection of the top chamber is scheduled in 21st-22nd. TMP, cone bellows, and cross tubes will be assembled.
- Pre-isolator: The assembly of two pre-isolators for SR is on going in ATC.
- EQ stop, release sensor, dummy payload: The remain parts were delivered on 12th.
- BF damper: The production is on going.
- Maraging wire: The production is on going.
- Tooling for installation: The support frame for the PI was delivered and assembled. The fiber scope will be ordered.
Type B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Incidents:
- Foreseen risks
Discussion
- Wires for RM. 0.65 (seems to be too thick), 0.6, or more thinner?? (Shoda)
- Type-B simulation results (Okutomi)
Site work plan for the next week
- Mon: extended chief meeting
- Tue: PI installation
- Wed: PI installation
- Thu: PI installation
- Fri: Holiday
Travel Plans
- Travel (Week of 12/19):
- Takahashi: 19-22 (Ext. Cheif Meeting/PI install)
- Shoda: 19-22 (Ext. Cheif Meeting/PR3 test hanging)
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki: 20-22 (PI install)
- Hirata:
- Sato:
- Enzo: 20-22 (PR3 test hanging)
- Ohishi:
- Travel (Week of 12/26):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
Next meeting
On 2017/1/6(Fri)