Line 11: Line 11:
 * Put a report here  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes of Type-A Meeting]]
 * Transportation: The second transportation for EQ stot parts and tools is scheduled in 10-11th for Kamioka and 12-13th for Y-end in January.
 * EXV chamber: Connection of the top chamber is scheduled in 21st-22nd. TMP, cone bellows, and cross tubes will be assembled.
 * Pre-isolator: The assembly of two pre-isolators for SR is on going in ATC.
 * EQ stop, release sensor, dummy payload: The remain parts were delivered on 12th.
 * BF damper: The production is on going.
 * Maraging wire: The production is on going.
 * Tooling for installation: The support frame for the PI was delivered and assembled. The fiber scope will be ordered.

Agenda/Minutes of the VIS Meeting on 2016/12/16

2016/12/16 13:30 -

Participants:

Progress report

Schedule Chart (PDF,MPP) (To Be Updated)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Transportation: The second transportation for EQ stot parts and tools is scheduled in 10-11th for Kamioka and 12-13th for Y-end in January.
  • EXV chamber: Connection of the top chamber is scheduled in 21st-22nd. TMP, cone bellows, and cross tubes will be assembled.
  • Pre-isolator: The assembly of two pre-isolators for SR is on going in ATC.
  • EQ stop, release sensor, dummy payload: The remain parts were delivered on 12th.
  • BF damper: The production is on going.
  • Maraging wire: The production is on going.
  • Tooling for installation: The support frame for the PI was delivered and assembled. The fiber scope will be ordered.

Type B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Incidents:
  • Foreseen risks

Discussion

  • Wires for RM. 0.65 (seems to be too thick), 0.6, or more thinner?? (Shoda)
    • Type-B simulation results (Okutomi)

Site work plan for the next week

  • Mon: extended chief meeting
  • Tue: PI installation
  • Wed: PI installation
  • Thu: PI installation
  • Fri: Holiday

Travel Plans

  • Travel (Week of 12/19):
    • Takahashi: 19-22 (Ext. Cheif Meeting/PI install)
    • Shoda: 19-22 (Ext. Cheif Meeting/PR3 test hanging)
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki: 20-22 (PI install)
    • Hirata:
    • Sato:
    • Enzo: 20-22 (PR3 test hanging)
    • Ohishi:
  • Travel (Week of 12/26):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:

Next meeting

On 2017/1/6(Fri)