Differences between revisions 2 and 4 (spanning 2 versions)
Revision 2 as of 2016-12-15 11:56:05
Size: 2248
Comment:
Revision 4 as of 2016-12-15 13:07:56
Size: 2285
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
 * Transportation: The second transportation for EQ stot parts and tools is scheduled in 10-11th for Kamioka and 12-13th for Y-end in January.  * Transportation: The second transportation for EQ stop parts and tools is scheduled in 10-11th for Kamioka and 12-13th for Y-end in January.
Line 38: Line 38:
 * Bottom of the magnet bases (Aso)

Agenda/Minutes of the VIS Meeting on 2016/12/16

2016/12/16 13:30 -

Participants:

Progress report

Schedule Chart (PDF,MPP) (To Be Updated)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Transportation: The second transportation for EQ stop parts and tools is scheduled in 10-11th for Kamioka and 12-13th for Y-end in January.
  • EXV chamber: Connection of the top chamber is scheduled in 21st-22nd. TMP, cone bellows, and cross tubes will be assembled.
  • Pre-isolator: The assembly of two pre-isolators for SR is on going in ATC.
  • EQ stop, release sensor, dummy payload: The remain parts were delivered on 12th.
  • BF damper: The production is on going.
  • Maraging wire: The production is on going.
  • Tooling for installation: The support frame for the PI was delivered and assembled. The fiber scope will be ordered.

Type B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Incidents:
  • Foreseen risks

Discussion

  • Bottom of the magnet bases (Aso)
  • Wires for RM. 0.65 (seems to be too thick), 0.6, or more thinner?? (Shoda)
    • Type-B simulation results (Okutomi)

Site work plan for the next week

  • Mon: extended chief meeting
  • Tue: PI installation
  • Wed: PI installation
  • Thu: PI installation
  • Fri: Holiday

Travel Plans

  • Travel (Week of 12/19):
    • Takahashi: 19-22 (Ext. Cheif Meeting/PI install)
    • Shoda: 19-22 (Ext. Cheif Meeting/PR3 test hanging)
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki: 20-22 (PI install)
    • Hirata:
    • Sato:
    • Enzo: 20-22 (PR3 test hanging)
    • Ohishi:
  • Travel (Week of 12/26):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:

Next meeting

On 2017/1/6(Fri)

KAGRA/Subgroups/VIS/VISMinutes20161216 (last edited 2016-12-21 10:07:39 by MarkBarton)