Agenda/Minutes of the VIS Meeting on 2017/1/6
2017/1/6 13:30 -
Participants:
Progress report
Schedule Chart (PDF,MPP) (To Be Updated)
Type-A (Takahashi)
- Transportation: The second transportation for EQ stop parts and tools is scheduled in 10-11th from Mitaka to Kamioka by Kamoshida, on 12th to Y-end by Kamioka-kogyo, and on 13th to 2F by MESCO.
- EYV chamber: The top chamber was connected on 20th in December. Two cross tubes were assembled too. The piston system was modified, so cone bellows were not necessary. We started pump down the EYV system on 21st in December.
- Pre-isolator: The assembly of two pre-isolators for SR were almost finished in ATC. The boxes are necessary for packing.
- EQ stop, release sensor, dummy payload: Delivered parts were checked on 21st and 22nd in December.
- BF damper: The production is on going.
- Maraging wire: The production is on going.
- Tooling for installation: The fiber scope was ordered. The items were packed on 4th to ship.
Type B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Incidents:
- Foreseen risks
Discussion
- How to track design changes ?
- How to keep track of items
- Smaller coils/magnet bases (Aso)
Site work plan for the next week
- Mon:
- Tue:
- Wed:
- Thu:
- Fri:
Travel Plans
- Travel (Week of 1/9):
- Takahashi: 10-13
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato: 10-13
- Enzo:
- Ohishi:
- Travel (Week of 1/16):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
Next meeting
On 2017/1/13(Fri)