Line 56: Line 56:
   * Test assemble them in Mitaka on Feb. 2nd.
Line 77: Line 78:
 * Incidents:  * Incidents: cut finger with a stainless steel sheet
  * We need to wear globes for this kind of work

Type-A:
Type-B: Crane work to lift the BF up.
Type-Bp: No heavy lifting. Mirror does not move.
Line 80: Line 87:
  * Type-A:
  * Type-B:
  * Type-Bp:
  * Type-A: Open the top chamber (a crane work).
  * Type-B: Crane work to lift the BF up.
  * Type-Bp: No heavy lifting. Mirror does not move.
Line 87: Line 94:
  * We will use the same PEEK (Ketron CA30). This material was chosen to avoid charging.
Line 89: Line 97:
 * Mon:
 * Tue:
 * Wed:
 * Thu:
 * Fri:
 * Mon: BF blade adjustment (B)/Hang IM(Bp)
 * Tue: BF damper pre-assembly (A)/BF blade adjustment (B)/Assemble IMRM (Bp)
 * Wed: BF damper pre-assembly (A)/BF blade adjustment (B)/Assemble IMRM (Bp), Delivery of the parts for optical bench (Bp)
 * Thu: Open the chamber (A)/BF blade adjustment (B)
 * Fri: Set up assembly frame (A)/BF blade adjustment (B)
Line 98: Line 106:
  * Takahashi: 30-2/3
  * Shoda: 31-2/3
  * Takahashi: 31-2/3
  * Shoda: 30-2/1
Line 101: Line 109:
  * Fabian:   * Fabian: 30-2/3
Line 103: Line 111:
  * Fujii: 
  * Ishizaki: 30-2/3
  * Fujii:
  * Ishizaki: 31-2/3
Line 106: Line 114:
  * Sato: 30-2/3   * Sato:
Line 108: Line 116:
  * Hashimoto (Hosei Univ.):
  * Someya (Hosei Univ.): 
  * Hashimoto (Hosei Univ.): 30-2/1
  * Someya (Hosei Univ.):30-2/1

Agenda/Minutes of the VIS Meeting on 2017/1/27

2017/1/27 13:30 -

Participants: Tanaka, Mark, Sato, Ishizaki, Fabian, Hirata, Okutomi, Shoda, Enzo, Someya, Hashimoto, Akutsu

Progress report

Schedule Chart : (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • EYV chamber: Top chamber was connected again.
  • Pre-isolator: The pre-isolators for SR were packed and moved out of the large clean room on 23rd.
  • BF damper: Checked delivered parts on 24th.
  • Maraging wire: The wires are delivered on 31st. They are sent to the thermal proccess on 1st February. To be shipped to Kamioka on Feb. 7th.
    • The 3.3m wire can be treated at Himeji facility of Kinzoku-giken.
  • Preparation of installation: The floor of clean booth was covered by stainless steel sheet. The foot holds were assembled.
    • Other large tools (rack, wagon, desk, so on) also were installed into the clean booth.
    Next Week Plan
  • BF damping pre-assembly
  • Open the top chamber.
  • Set the assembly base.
  • Sato-san will stay in Mitaka to send the delivered rods to the heat treatment. Also incorporate cables into the Type-A CAD model.

Type B (Mark)

  • Hirata-san:
    • Received many parts from i-ject for BFRM (took pictures and took them into ATC cleanroom).
    • got quotes for PRM/SRM payload from i-ject.
    • Checked quotes and asked for some modifications.)
    • Washed parts (parts for type-A, small hexagons, screws, etc\)
    • Wiped 9 piano wires and sent to Kamioka for PR.
    • pdated Fabian's EQstop parts for BS recoilmass and updated EQstop assy drawings.
  • Fabian
    • Worked out geometry for blade adjustment.
    • Designed additional ballast masses for BS BF (and SR).
  • Mark and Enzo (at Kamioka)
    • Did two rounds of adjustment of the blades with help from Takahashi-san (one for position, one for frequency)
    • Surveyed the position of the rod using the vertical mode of the bubble level.
    • Got apparent improvement as judged at the IRM-IM EQ stops (but still not perfect).
    • Did one more round of blade adjustments (without Takahashi-san)
    • Got good agreement with IRM-IM EQ stops, so put BF cap on and raised the whole system to check for balance.
    • Found balance still fairly bad: about the same on the -X,+Y diagonal and about half on the +X,+Y diagonal (70 and 30 mm worth of motion of a single trim mass respectively; previous a bit over 70 mm each). Moreover, IRM-IM alignment no longer good.
    • From the imbalance torques, calculated the offset of rod as 2.3 mm in the direction 22 degrees to the +X side of -Y.
    • Calculated the blade adjustments required: {-0.325194, -1.79175, 2.11695} mm
    • Prepared to apply adjustments (removed cap etc).

Type-Bp (Shoda)

  • Hanging Report: TF measured, BF has been set.

    • EQ stop parts below the BF were assembled.
    • We measured TFs of RM using PSs. (Their alignment was not so easy.)
    • BF was placed on the EQ stop. (Traverser was moved out of the clean room for accesibility.)
    • BF and IM was connected. Not hanged yet.
    • BFRM parts were delivered.
      • Test assemble them in Mitaka on Feb. 2nd.
  • Next week task: Hang IRM

    • Hang IM and adjust the weight.
    • Hang IRM and balance IM.
    • IRM and set OSEMs.
  • A mirror box was sent to a company for modification
  • Flag bases were sent to a company for modification
  • Winch were sent to Mitaka for inspection
  • To do

    • Establish disassemble procedure
    • Buy the new tools

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • WDS PCB Design Document.Main rack( Main board + peripheral board )design.

Safety

  • Incidents: cut finger with a stainless steel sheet
    • We need to wear globes for this kind of work

Type-A: Type-B: Crane work to lift the BF up. Type-Bp: No heavy lifting. Mirror does not move.

  • Foreseen risks
    • Type-A: Open the top chamber (a crane work).
    • Type-B: Crane work to lift the BF up.
    • Type-Bp: No heavy lifting. Mirror does not move.

Discussion

  • Smaller coil design status update (Aso)
    • We will use the same PEEK (Ketron CA30). This material was chosen to avoid charging.

Site work plan for the next week

  • Mon: BF blade adjustment (B)/Hang IM(Bp)
  • Tue: BF damper pre-assembly (A)/BF blade adjustment (B)/Assemble IMRM (Bp)
  • Wed: BF damper pre-assembly (A)/BF blade adjustment (B)/Assemble IMRM (Bp), Delivery of the parts for optical bench (Bp)
  • Thu: Open the chamber (A)/BF blade adjustment (B)
  • Fri: Set up assembly frame (A)/BF blade adjustment (B)

Travel Plans

  • Travel (Week of 1/30):
    • Takahashi: 31-2/3
    • Shoda: 30-2/1
    • Mark: 30-2/3
    • Fabian: 30-2/3
    • Okutomi: 30-2/3
    • Fujii:
    • Ishizaki: 31-2/3
    • Hirata:
    • Sato:
    • Enzo: 30-2/3
    • Hashimoto (Hosei Univ.): 30-2/1
    • Someya (Hosei Univ.):30-2/1
    • Ohishi:
  • Travel (Week of 2/6):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Hashimoto (Hosei Univ.):
    • Someya (Hosei Univ.):
    • Ohishi:

Next meeting

On 2017/2/3(Fri) VIS F2F: Feb. 17th