Differences between revisions 3 and 5 (spanning 2 versions)
Revision 3 as of 2017-01-25 14:56:23
Size: 2651
Editor: YoichiAso
Comment:
Revision 5 as of 2017-01-25 14:58:58
Size: 1433
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 36: Line 36:


 * Travel plan for the rest of the FY (Aso)
  * Please check and update (if necessary) the following travel sheet.
  * [[https://1drv.ms/x/s!Ajrs5Q_CgYCOhCYAoyZZGXoejFRq|Travel Plan Sheet]]
Line 43: Line 37:
  * Two possible designs for the magnet base
   * LIGO style one: [[https://www.dropbox.com/s/h47gump6ygi16gg/Small-Magnet-Assy-LIGO-Style.png?dl=0|image]]
    * A dumbbell shaped aluminum stand-off
    * Smaller footprint -> smaller thermal noise
    * Relatively soft (14kHz internal resonance)
    * Easy to be bent
   * VIRGO style one: [[https://www.dropbox.com/s/imzpz3pwt0dlg5s/Small-Magnet-Assy-VIRGO-Style.png?dl=0|image]]
    * Embedding a magnet in a aluminum cylinder
    * Has a larger footprint -> larger thermal noise.
    * Rigid structure. Internal mode frequency is about 94kHz.
  * After some discussion, we will employ the VIRGO like design.
   * We probably do not need a chamfer.
Line 58: Line 39:
 * Mon: BF Adjustment (Type-B)/Measure TF (Type-Bp)
 * Tue: Preparation (Type-A)/BF Adjustment (Type-B)/EQ stop assembly, BF setting (Type-Bp)
 * Wed: Preparation (Type-A)/BF Adjustment (Type-B)/IM haning (Type-Bp)
 * Thu: Preparation (Type-A)/TF measurement (Type-B)/IM haning (Type-Bp)
 * Fri: Preparation (Type-A)/TF measurement (Type-B)/IM haning (Type-Bp)
 * Mon:
 * Tue:
 * Wed:
 * Thu:
 * Fri:
Line 65: Line 46:

 * Travel (Week of 1/23):
  * Takahashi: 23-27
  * Shoda: 23-27
  * Mark: 23-27
  * Fabian:
  * Okutomi: 23-27
  * Fujii:
  * Ishizaki:
  * Hirata:
  * Sato: 23-27
  * Enzo: 23-27
  * Hashimoto (Hosei Univ.): 25-27
  * Someya (Hosei Univ.): 23-27
  * Ohishi:
Line 92: Line 58:
  * Hashimoto (Hosei Univ.):
  * Someya (Hosei Univ.):
Line 94: Line 62:
 * Travel (Week of 2/6):
  * Takahashi:
  * Shoda:
  * Mark:
  * Fabian:
  * Okutomi:
  * Fujii:
  * Ishizaki:
  * Hirata:
  * Sato:
  * Enzo:
  * Hashimoto (Hosei Univ.):
  * Someya (Hosei Univ.):
  * Ohishi:
Line 96: Line 78:
On 2017/1/27(Fri) On 2017/2/3(Fri)

Agenda/Minutes of the VIS Meeting on 2017/1/27

2017/1/27 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

Type-A (Takahashi)

  • Put a report here

Type B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • Smaller coil design status update (Aso)

Site work plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 1/30):
    • Takahashi: 30-2/3
    • Shoda: 31-2/3
    • Mark: 30-2/3
    • Fabian:
    • Okutomi: 30-2/3
    • Fujii:
    • Ishizaki: 30-2/3
    • Hirata:
    • Sato: 30-2/3
    • Enzo: 30-2/3
    • Hashimoto (Hosei Univ.):
    • Someya (Hosei Univ.):
    • Ohishi:
  • Travel (Week of 2/6):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Hashimoto (Hosei Univ.):
    • Someya (Hosei Univ.):
    • Ohishi:

Next meeting

On 2017/2/3(Fri) VIS F2F: Feb. 17th

KAGRA/Subgroups/VIS/VISMinutes20170127 (last edited 2017-01-27 20:06:09 by NaokoOhishi)