* Put a report here | * Put a report here * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes of Type-A Meeting]] * Preparation of installation: The hoist tool was assembled. The pallet and the hand lifter was prepared to open the top chamber. Protection net was assembled, but the diameter was too large a little. It will be made smaller. * EYV chamber: Top chamber was opened and the frame lock was installed. * BF damper: Pre-assembly of the BF damper was started. * Pre-isolator: We withdraw the setup of assembling the pre-isolators from the large clean room. * Maraging wire: The wires were delivered on 31st January. They were sent to the thermal process on 1st February. The 3.3m wire will be treated at Himeji facility of Kinzoku-giken. |
Agenda/Minutes of the VIS Meeting on 2017/2/3
2017/2/3 13:30 -
Participants:
Progress report
Type-A (Takahashi)
Type B (Mark)
Put a report here * Minutes of Type-A Meeting
- Preparation of installation: The hoist tool was assembled. The pallet and the hand lifter was prepared to open the top chamber.
- Protection net was assembled, but the diameter was too large a little. It will be made smaller.
- EYV chamber: Top chamber was opened and the frame lock was installed.
- BF damper: Pre-assembly of the BF damper was started.
- Pre-isolator: We withdraw the setup of assembling the pre-isolators from the large clean room.
- Maraging wire: The wires were delivered on 31st January. They were sent to the thermal process on 1st February.
- The 3.3m wire will be treated at Himeji facility of Kinzoku-giken.
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Site work plan for the next week
- Mon:
- Tue:
- Wed:
- Thu:
- Fri:
Travel Plans
- Travel (Week of 2/6):
- Takahashi: 6-10
- Shoda: 6-10
- Mark: 6-10
- Fabian: 6-10
- Okutomi: 6-10
- Fujii:
- Ishizaki: 6-10
- Hirata: 6-10
- Sato: 6-10
- Enzo: 6-10
- Hashimoto (Hosei Univ.): 6-10
- Someya (Hosei Univ.): 6-10
- Ohishi:
- Travel (Week of 2/13):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Hashimoto (Hosei Univ.):
- Someya (Hosei Univ.):
- Ohishi:
Next meeting
On 2017/2/10(Fri)
VIS F2F: Feb. 17th
March VIS F2F: March 3