Differences between revisions 3 and 4
Revision 3 as of 2017-02-02 21:48:12
Size: 2152
Comment:
Revision 4 as of 2017-02-02 21:48:50
Size: 2152
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:


=== Type B (Mark) ===
 * Put a report here
* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes of Type-A Meeting]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Meeting|Minutes of Type-A Meeting]]
Line 22: Line 19:

=== Type B (Mark) ===
 * Put a report here

Agenda/Minutes of the VIS Meeting on 2017/2/3

2017/2/3 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

Type-A (Takahashi)

  • Minutes of Type-A Meeting

  • Preparation of installation: The hoist tool was assembled. The pallet and the hand lifter was prepared to open the top chamber.
    • Protection net was assembled, but the diameter was too large a little. It will be made smaller.
  • EYV chamber: Top chamber was opened and the frame lock was installed.
  • BF damper: Pre-assembly of the BF damper was started.
  • Pre-isolator: We withdraw the setup of assembling the pre-isolators from the large clean room.
  • Maraging wire: The wires were delivered on 31st January. They were sent to the thermal process on 1st February.
    • The 3.3m wire will be treated at Himeji facility of Kinzoku-giken.

Type B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Site work plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

Travel Plans

  • Travel (Week of 2/6):
    • Takahashi: 6-10
    • Shoda: 6-10
    • Mark: 6-10
    • Fabian: 6-10
    • Okutomi: 6-10
    • Fujii:
    • Ishizaki: 6-10
    • Hirata: 6-10
    • Sato: 6-10
    • Enzo: 6-10
    • Hashimoto (Hosei Univ.): 6-10
    • Someya (Hosei Univ.): 6-10
    • Ohishi:
  • Travel (Week of 2/13):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Hashimoto (Hosei Univ.):
    • Someya (Hosei Univ.):
    • Ohishi:

Next meeting

On 2017/2/10(Fri)

VIS F2F: Feb. 17th

March VIS F2F: March 3

KAGRA/Subgroups/VIS/VISMinutes20170203 (last edited 2017-02-03 20:47:00 by RyutaroTakahashi)