Size: 1487
Comment:
|
Size: 2372
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
Installation in Y-end: 28th(Tue) * Scraped the inner side of the F3 cap by a reamer and covered the cap onto the base plate of F3. * Put the F3 on the end plate inserting the maraging wire for BF. * Released the keystone of F3. 1st(Wed) * Started tuning of F3. Adjusted the height of F3 for the end plate. * Moved the EQ stop, the ballast ring, and the cross tubes to X-end. 2nd(Thu) * Continued tuning of F3. * Opened the cap of BF, and put additional 4 ballast weight. * Adjusted the height of release sensors for F3. * The inner diameter of wire cramp (small hexagon) for the suspension wire was too small. |
|
Line 13: | Line 28: |
* Test of the LVDT and the FR. * Cabling from the BF to the F3. * Assembly of the BF damper. * Lift down the BF stage into the tube. |
|
Line 39: | Line 58: |
=== VIS budget FY2017 === * [[https://1drv.ms/x/s!Ajrs5Q_CgYCOhDmdIfYLxfXEMLxs|Budget Sheet]] |
Agenda/Minutes of the VIS Meeting on 2017/3/03
2017/3/03 13:30 -
Participants:
Progress report
Type-A (Takahashi)
Past week report
Installation in Y-end:
28th(Tue)
- Scraped the inner side of the F3 cap by a reamer and covered the cap onto the base plate of F3.
- Put the F3 on the end plate inserting the maraging wire for BF.
- Released the keystone of F3.
1st(Wed)
- Started tuning of F3. Adjusted the height of F3 for the end plate.
- Moved the EQ stop, the ballast ring, and the cross tubes to X-end.
2nd(Thu)
- Continued tuning of F3.
- Opened the cap of BF, and put additional 4 ballast weight.
- Adjusted the height of release sensors for F3.
- The inner diameter of wire cramp (small hexagon) for the suspension wire was too small.
Plan for coming weeks
- Test of the LVDT and the FR.
- Cabling from the BF to the F3.
- Assembly of the BF damper.
- Lift down the BF stage into the tube.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Plan for coming weeks
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
VIS budget FY2017
Travel Plans
- Travel (Week of 3/6):
- Takahashi: 3/6-3/10
- Shoda: 3/6-3/10
- Mark: 3/6-3/10
- Fabian: 3/6-3/10
- Okutomi: 3/6-3/10
- Fujii:
- Ishizaki: 3/6-3/10
- Hirata: 3/6-3/10
- Sato: 3/6-3/10
- Enzo: 3/6-3/10
- Hashimoto (Hosei Univ.): 3/6-3/10
- Ohishi:
- Tanaka:
- Perry: 3/6-3/10
- Travel (Week of 3/13):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Hashimoto (Hosei Univ.):
- Ohishi:
- Tanaka:
Next meeting
On 2017/3/10(Fri)