* Assembly completed!! * We could adjust the weight and balance the BF by removing the spider cable clamp. * Hashimoto-san and Miyo-kun made the temporally combiner circuit for the BF LVDTs. We could obtain signals using it. * All the signals and motors are checked. Actuation check for BF LVDT and SF GAS LVDT is remained. |
|
Line 40: | Line 45: |
* Actuation check * Installation into the chamber |
Agenda/Minutes of the VIS Meeting on 2017/3/03
2017/3/03 13:30 -
Participants:
Progress report
Type-A (Takahashi)
Past week report
Installation in Y-end:
28th(Tue)
- Scraped the inner side of the F3 cap by a reamer and covered the cap onto the base plate of F3.
- Put the F3 on the end plate inserting the maraging wire for BF.
- Released the keystone of F3.
1st(Wed)
- Started tuning of F3. Adjusted the height of F3 for the end plate.
- Moved the EQ stop, the ballast ring, and the cross tubes to X-end.
2nd(Thu)
- Continued tuning of F3.
- Opened the cap of BF, and put additional 4 ballast weight.
- Adjusted the height of release sensors for F3.
- The inner diameter of wire cramp (small hexagon) for the suspension wire was too small.
Plan for coming weeks
- Test of the LVDT and the FR.
- Cabling from the BF to the F3.
- Assembly of the BF damper.
- Lift down the BF stage into the tube.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
- Assembly completed!!
- We could adjust the weight and balance the BF by removing the spider cable clamp.
- Hashimoto-san and Miyo-kun made the temporally combiner circuit for the BF LVDTs. We could obtain signals using it.
- All the signals and motors are checked. Actuation check for BF LVDT and SF GAS LVDT is remained.
Plan for coming weeks
- Actuation check
- Installation into the chamber
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
- I'm working on design drawing for cutting of 19'rack front panel(4ch WDS Main box)(Continue as last week).
Drawing both for external ordering and for CNC Milling machine(Numerical control program(G-code)). PDF(JGW-E1706302)
- Electronic parts ordered from co-op(Univ.Tokyo) have not come yet(Has not come yet!!).
Plan for coming weeks
- Design for processing(Continuation).
Pending ---> I'm planning to perform surface mounting for Power board(WDS Main 4ch Box) in reflow furnace in Akihabara.Since a large PCB size( 320mm * 100mm) is required,a large reflow furnace is necessary,so it can be borrowed in Akihabara(DMM-make site.And of course,paid).
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
VIS budget FY2017
Travel Plans
- Travel (Week of 3/6):
- Takahashi: 3/6-3/10
- Shoda: 3/6-3/10
- Mark: 3/6-3/10
- Fabian: 3/6-3/10
- Okutomi: 3/6-3/10
- Fujii:
- Ishizaki: 3/6-3/10
- Hirata: 3/6-3/10
- Sato: 3/6-3/10
- Enzo: 3/6-3/10
- Hashimoto (Hosei Univ.): 3/6-3/10
- Ohishi:
- Tanaka:
- Perry: 3/6-3/10
- Travel (Week of 3/13):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Hashimoto (Hosei Univ.):
- Ohishi:
- Tanaka:
Next meeting
On 2017/3/10(Fri)