Size: 1407
Comment:
|
Size: 2099
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
Schedule Chart : ([[https://www.dropbox.com/s/rlnmlt3uipcsai8/VIS%20Overall%20Schedule-20170121.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/rlnmlt3uipcsai8/VIS%20Overall%20Schedule-20170121.pdf?dl=0|MPP]]) | Schedule Chart : ([[https://www.dropbox.com/s/3fllgzwp4wlew2k/VIS%20Overall%20Schedule-20170322.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/agsjc8jqo2t6vxu/VIS%20Overall%20Schedule-20170322.mpp?dl=0|MPP]]) |
Line 12: | Line 12: |
Installation in Y-end: No work at the site. * Odered some items for the X-end (chain blocks, hand lifter). * Preparing for the Type-A experiments (modification of geophone pod). |
|
Line 13: | Line 18: |
* Assemble the F2 stage. | |
Line 28: | Line 34: |
*Operational test(for power unit) acquisition and analysis of thermal data.-->Report[[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0064/E1706434/001/Project%20WDS%20H_W%20Regulator%20heat%20dissipation%20experiment%20170331.pdf|PDF(JGW-E1706434)]] *Main board(WDS main PCB) mounting and implementation. |
|
Line 29: | Line 39: |
*Main board(WDS main PCB) mounting and implementation(Ongoing). | |
Line 42: | Line 52: |
* Travel (Week of 3/27): * Takahashi: * Shoda: * Mark: * Fabian: * Okutomi: |
* Travel (Week of 4/3): * Takahashi: 3-6 * Shoda: 3-6 * Mark: 3-6 * Fabian: 3-6 * Okutomi: 3-6 |
Line 49: | Line 59: |
* Ishizaki: * Hirata: * Sato: * Enzo: * Hashimoto (Hosei Univ.): |
* Ishizaki: ?-6 * Hirata: 3-6 * Sato: 3-6 * Enzo: 3-6 |
Line 56: | Line 65: |
* Perry: | * Perry: 3-7 * Sekiguchi(Hosei): ?-? * Hirayama(Hosei): ?-? * Wada (Ando Lab.): 3-5 |
Line 59: | Line 71: |
* Travel (Week of 4/3): | * Travel (Week of 4/10): |
Line 70: | Line 82: |
* Hashimoto (Hosei Univ.): | |
Line 73: | Line 84: |
* Perry: * Sekiguchi(Hosei): * Hirayama(Hosei): |
Agenda/Minutes of the VIS Meeting on 2017/3/31
2017/3/31 13:30 -
Participants:
Progress report
Type-A (Takahashi)
Past week report
Installation in Y-end: No work at the site.
- Odered some items for the X-end (chain blocks, hand lifter).
- Preparing for the Type-A experiments (modification of geophone pod).
Plan for coming weeks
- Assemble the F2 stage.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Operational test(for power unit) acquisition and analysis of thermal data.-->ReportPDF(JGW-E1706434)
- Main board(WDS main PCB) mounting and implementation.
Plan for coming weeks
- Main board(WDS main PCB) mounting and implementation(Ongoing).
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 4/3):
- Takahashi: 3-6
- Shoda: 3-6
- Mark: 3-6
- Fabian: 3-6
- Okutomi: 3-6
- Fujii:
- Ishizaki: ?-6
- Hirata: 3-6
- Sato: 3-6
- Enzo: 3-6
- Ohishi:
- Tanaka:
- Perry: 3-7
- Sekiguchi(Hosei): ?-?
- Hirayama(Hosei): ?-?
- Wada (Ando Lab.): 3-5
- Travel (Week of 4/10):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
- Tanaka:
- Perry:
- Sekiguchi(Hosei):
- Hirayama(Hosei):
Next meeting
On 2017/4/7(Fri) F2F@Mitaka