Agenda/Minutes of the VIS Meeting on 2017/3/31
2017/3/31 13:30 -
Participants:
Progress report
Type-A (Takahashi)
Past week report
Installation in Y-end: No work at the site.
- Odered some items for the X-end (chain blocks, hand lifter).
- Preparing for the Type-A experiments (modification of geophone pod).
Plan for coming weeks
- Assemble the F2 stage.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Plan for coming weeks
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 4/3):
- Takahashi: 3-6
- Shoda: 3-6
- Mark: 3-6
- Fabian: 3-6
- Okutomi: 3-6
- Fujii:
- Ishizaki: ?-6
- Hirata: 3-6
- Sato: 3-6
- Enzo: 3-6
- Ohishi:
- Tanaka:
- Perry: 3-7
- Sekiguchi(Hosei): ?-?
- Hirayama(Hosei): ?-?
- Wada (Ando Lab.): 3-5
- Travel (Week of 4/10):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
- Tanaka:
- Perry:
- Sekiguchi(Hosei):
- Hirayama(Hosei):
Next meeting
On 2017/4/7(Fri) F2F@Mitaka