Line 34: Line 34:
 *Operational test(for power unit) acquisition and analysis of thermal data.-->Report[[http://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0064/E1706434/001/Project%20WDS%20H_W%20Regulator%20heat%20dissipation%20experiment%20170331.pdf|PDF(JGW-E1706434)]]
 
 *Main board(WDS main PCB) mounting and implementation.
Line 35: Line 39:
 *Main board(WDS main PCB) mounting and implementation(Ongoing).

Agenda/Minutes of the VIS Meeting on 2017/3/31

2017/3/31 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

Type-A (Takahashi)

Past week report

Installation in Y-end: No work at the site.

  • Odered some items for the X-end (chain blocks, hand lifter).
  • Preparing for the Type-A experiments (modification of geophone pod).

Plan for coming weeks

  • Assemble the F2 stage.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Operational test(for power unit) acquisition and analysis of thermal data.-->ReportPDF(JGW-E1706434)

  • Main board(WDS main PCB) mounting and implementation.

Plan for coming weeks

  • Main board(WDS main PCB) mounting and implementation(Ongoing).

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Travel Plans

  • Travel (Week of 4/3):
    • Takahashi: 3-6
    • Shoda: 3-6
    • Mark: 3-6
    • Fabian: 3-6
    • Okutomi: 3-6
    • Fujii:
    • Ishizaki: ?-6
    • Hirata: 3-6
    • Sato: 3-6
    • Enzo: 3-6
    • Ohishi:
    • Tanaka:
    • Perry: 3-7
    • Sekiguchi(Hosei): ?-?
    • Hirayama(Hosei): ?-?
    • Wada (Ando Lab.): 3-5
  • Travel (Week of 4/10):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:
    • Tanaka:
    • Perry:
    • Sekiguchi(Hosei):
    • Hirayama(Hosei):

Next meeting

On 2017/4/7(Fri) F2F@Mitaka