Size: 2099
Comment:
|
Size: 3205
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 14: | Line 14: |
* Odered some items for the X-end (chain blocks, hand lifter). | * Ordered some items for the X-end (chain blocks, hand lifter). |
Line 22: | Line 22: |
* Mark, Fabian, Enzo, Hirata-san at f2f - no site work. * Mark and Enzo worked on updates to suspension cabling diagram E1503600. * Hirata-san worked on 2D drawings for new BF ballast masses and PR/SR mirror box mods. |
|
Line 23: | Line 27: |
===== Week of 4/3 ===== * Clean up after floor work. * Prepare PI for moving. * Remove accelerometers. * Remove large weights. * Remove arc weights. * Attach lifting plates. * Wrap with clingwrap, cover with spare cleanbag. * Clear path to remove PI with forklift. * Move worktables. * Move portable cleanroom. * Shutdown rack and move electrical cables. * Prepare second floor for receiving PI. * Clean and clingwrap pallet. * Double-check dimensions. * Disconnect fan cables, curtain. * Crane PI into clean booth. ===== Week of 4/10 ===== * Add temporary ballast to SF. * Lift SF/BF/... section and check/adjust pitch/roll of SF and total weight. * Continue rearrangement of in-vacuum cabling past SF. * Prepare PI for craning onto assembly frame. * Finish installing LVDT coils. * ... * Find additional arc weights. |
Agenda/Minutes of the VIS Meeting on 2017/3/31
2017/3/31 13:30 -
Participants:
Progress report
Type-A (Takahashi)
Past week report
Installation in Y-end: No work at the site.
- Ordered some items for the X-end (chain blocks, hand lifter).
- Preparing for the Type-A experiments (modification of geophone pod).
Plan for coming weeks
- Assemble the F2 stage.
Type B (Mark)
Past week report
- Mark, Fabian, Enzo, Hirata-san at f2f - no site work.
- Mark and Enzo worked on updates to suspension cabling diagram E1503600.
- Hirata-san worked on 2D drawings for new BF ballast masses and PR/SR mirror box mods.
Plan for coming weeks
Week of 4/3
- Clean up after floor work.
- Prepare PI for moving.
- Remove accelerometers.
- Remove large weights.
- Remove arc weights.
- Attach lifting plates.
- Wrap with clingwrap, cover with spare cleanbag.
- Clear path to remove PI with forklift.
- Move worktables.
- Move portable cleanroom.
- Shutdown rack and move electrical cables.
- Prepare second floor for receiving PI.
- Clean and clingwrap pallet.
- Double-check dimensions.
- Disconnect fan cables, curtain.
- Crane PI into clean booth.
Week of 4/10
- Add temporary ballast to SF.
- Lift SF/BF/... section and check/adjust pitch/roll of SF and total weight.
- Continue rearrangement of in-vacuum cabling past SF.
- Prepare PI for craning onto assembly frame.
- Finish installing LVDT coils.
- ...
- Find additional arc weights.
Type-Bp (Shoda)
Past week report
Plan for coming weeks
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Operational test(for power unit) acquisition and analysis of thermal data.-->ReportPDF(JGW-E1706434)
- Main board(WDS main PCB) mounting and implementation.
Plan for coming weeks
- Main board(WDS main PCB) mounting and implementation(Ongoing).
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 4/3):
- Takahashi: 3-6
- Shoda: 3-6
- Mark: 3-6
- Fabian: 3-6
- Okutomi: 3-6
- Fujii:
- Ishizaki: ?-6
- Hirata: 3-6
- Sato: 3-6
- Enzo: 3-6
- Ohishi:
- Tanaka:
- Perry: 3-7
- Sekiguchi(Hosei): ?-?
- Hirayama(Hosei): ?-?
- Wada (Ando Lab.): 3-5
- Travel (Week of 4/10):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
- Tanaka:
- Perry:
- Sekiguchi(Hosei):
- Hirayama(Hosei):
Next meeting
On 2017/4/7(Fri) F2F@Mitaka