Differences between revisions 6 and 7
Revision 6 as of 2017-04-21 11:53:06
Size: 2835
Editor: YoichiAso
Comment:
Revision 7 as of 2017-04-21 13:17:38
Size: 3225
Editor: AyakaShoda
Comment:
Deletions are marked like this. Additions are marked like this.
Line 43: Line 43:
 * IM TF measured
  * IM OSEMs are adjusted
  * IM TFs are measured
 * BF/BFRM stage assembled
  * We closed the cap, and cabling was done till the top of the BF.
  * Set the top plate and Traverser on the assembly frame and connected to the EQ stop.
  * BFRM is suspended from the Traverser interface plate.
Line 44: Line 52:
 * Optical bench installation test
 * Set SF and hang BF (optional)

Agenda/Minutes of the VIS Meeting on 2017/4/21

2017/4/21 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Installation in Y-end:

17th(Mon)

  • Cleaned the booth and opened the chamber.
  • Unpacked the F1 and moved it into the clean booth.

18th(Tue)

  • Assembled the end plate 1.
  • Checked behavior of F2. The frequency depends on the stress due to the cap.

19th(Wed)

  • Extended the EQ stop to the F1 stage.
  • Prepared for the F1 damper.
  • Cabling of the F1.
  • Put the F1 on the EQ stop.

20th(Thu)

  • Replaced two release sensors.
  • Cabling between F1 and F2.

Plan for coming weeks

  • Setting of the F1.
  • Prepare for the pre-isolator.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

  • IM TF measured
    • IM OSEMs are adjusted
    • IM TFs are measured
  • BF/BFRM stage assembled
    • We closed the cap, and cabling was done till the top of the BF.
    • Set the top plate and Traverser on the assembly frame and connected to the EQ stop.
    • BFRM is suspended from the Traverser interface plate.

Plan for coming weeks

  • Optical bench installation test
  • Set SF and hang BF (optional)

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Start operation test of system.-->Interrupution.

    • Resolved.
      • When changing theOS(Win7 to Win10) and building the setup environment of S/W,problem occurs that the debug tool can't be used.-->I confirmed that this problem will be solved by rewriting a part of the registry.

      • A problem occcurred thatcould't be compiled even though the version of the compiler was the same.-->I solved the problem by patching the required include files.

Plan for coming weeks

  • Start operation test of system.-->Ongoing.

Safety

Discussion

Travel Plans

  • Travel (Week of 4/24):
    • Takahashi: 24-28
    • Shoda: 24-28
    • Mark: 24-27
    • Fabian: 24-26
    • Okutomi: 24-28
    • Fujii:
    • Ishizaki: 24-28
    • Hirata: 24-27
    • Sato: 24-28
    • Enzo: 24-27
    • Ohishi:
    • Tanaka:
    • Perry: 24-28
    • Sekiguchi(Hosei): 24-28
    • Hirayama(Hosei): 24-28
  • Travel (Week of 5/8):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:
    • Tanaka:
    • Perry:
    • Sekiguchi(Hosei):
    • Hirayama(Hosei):

Next meeting

On 2017/4/28(Fri)

KAGRA/Subgroups/VIS/VISMinutes20170421 (last edited 2017-04-21 16:16:17 by YoichiAso)