⇤ ← Revision 1 as of 2017-05-17 21:13:11
1578
Comment:
|
2032
|
Deletions are marked like this. | Additions are marked like this. |
Line 32: | Line 32: |
*Start mounting on the 19 inch rack(Main 4ch WDS box).--> Complete(the wiring is still). *Start formulating an experimental plan(First test) at the KAGRA site.--> *Draft plan[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0067/E1706737/001/Project%20WDS%20Experiment%20plan%20Drifts%20version%20170516.pdf|PDF(JGW-E1706737)]] |
|
Line 33: | Line 37: |
*Start creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing. |
Agenda/Minutes of the VIS Meeting on 2017/5/19
2017/5/19 13:30 -
Participants:
Progress report
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Start mounting on the 19 inch rack(Main 4ch WDS box).--> Complete(the wiring is still).
Start formulating an experimental plan(First test) at the KAGRA site.-->
Draft planPDF(JGW-E1706737)
Plan for coming weeks
Start creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
- JPS presentation
Travel Plans
- Travel (Week of 5/22):
- Takahashi: 24 - 25
- Shoda: 22 - 25
- Mark: 22 - 25
- Fabian: 22 - 25
- Okutomi: 22 - 25
- Fujii:
- Ishizaki: 22 - 25
- Hirata: 22 - 25
- Sato: 22 - 25
- Enzo: 22 - 25
- Ohishi:
- Tanaka:
- Sekiguchi(Hosei): 23 - 25
- Hirayama(Hosei): 23 - 25
- Travel (Week of 5/29):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
- Tanaka:
- Sekiguchi(Hosei):
- Hirayama(Hosei):
Next meeting
On 2017/5/26(Fri) F2F in Mitaka