Line 32: Line 32:
  *Start mounting on the 19 inch rack(Main 4ch WDS box).--> Complete(the wiring is still).
  *Start formulating an experimental plan(First test) at the KAGRA site.-->
     *Draft plan[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0067/E1706737/001/Project%20WDS%20Experiment%20plan%20Drifts%20version%20170516.pdf|PDF(JGW-E1706737)]]
Line 33: Line 37:
  *Start creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.

Agenda/Minutes of the VIS Meeting on 2017/5/19

2017/5/19 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Start mounting on the 19 inch rack(Main 4ch WDS box).--> Complete(the wiring is still).

  • Start formulating an experimental plan(First test) at the KAGRA site.-->

Plan for coming weeks

  • Start creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • JPS presentation

Travel Plans

  • Travel (Week of 5/22):
    • Takahashi: 24 - 25
    • Shoda: 22 - 25
    • Mark: 22 - 25
    • Fabian: 22 - 25
    • Okutomi: 22 - 25
    • Fujii:
    • Ishizaki: 22 - 25
    • Hirata: 22 - 25
    • Sato: 22 - 25
    • Enzo: 22 - 25
    • Ohishi:
    • Tanaka:
    • Sekiguchi(Hosei): 23 - 25
    • Hirayama(Hosei): 23 - 25
  • Travel (Week of 5/29):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:
    • Tanaka:
    • Sekiguchi(Hosei):
    • Hirayama(Hosei):

Next meeting

On 2017/5/26(Fri) F2F in Mitaka