Size: 1578
Comment:
|
Size: 3166
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 24: | Line 24: |
* SF was set on the Traverser, and the chain below BF was suspended from SF (in the week of 5/8) * BF weight and tilt was adjusted * We tuned the weight according to the height of the keystone. * Balanced the BF roughly according to the tilt of IRM. After that, we tuned more using the picomotors according to the IM OSEM signals. * We found the BF FR was not moving well. * We opened the BF cap a little bit by hanging from the SF, and checked that the BF FR still has the actuation range. * The problem was wiring. We found that the resistance between 2-7 pin was much high (usually ~9 Ω just before the driver, but resistance between 2-7 was ~60 kΩ). We fixed the cabling, and it started working again!! * The cap was closed after checking, and cabling was fixed. * Two of the old OSEM flags on PR2 cannot be removed so far. The gluing schedule was changed. |
|
Line 25: | Line 36: |
* Tilt alignment of BF & IM * Installation into the tank. |
|
Line 28: | Line 41: |
* Checked the designed IMMT mirror position in IOO coordinate. | |
Line 29: | Line 43: |
* Revise magnet fixture jig drawings * Have a meeting with FCL at Mitaka on 26th morning. |
|
Line 32: | Line 47: |
*Start mounting on the 19 inch rack(Main 4ch WDS box).--> Complete(the wiring is still). *Start formulating an experimental plan(First test) at the KAGRA site.--> *Draft plan[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0067/E1706737/001/Project%20WDS%20Experiment%20plan%20Drifts%20version%20170516.pdf|PDF(JGW-E1706737)]] |
|
Line 33: | Line 52: |
*Start creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing. | |
Line 58: | Line 78: |
* Ohishi: | * Ohishi: 25 night -26 (Mitaka) |
Agenda/Minutes of the VIS Meeting on 2017/5/19
2017/5/19 13:30 -
Participants:
Progress report
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
- SF was set on the Traverser, and the chain below BF was suspended from SF (in the week of 5/8)
- BF weight and tilt was adjusted
- We tuned the weight according to the height of the keystone.
- Balanced the BF roughly according to the tilt of IRM. After that, we tuned more using the picomotors according to the IM OSEM signals.
- We found the BF FR was not moving well.
- We opened the BF cap a little bit by hanging from the SF, and checked that the BF FR still has the actuation range.
- The problem was wiring. We found that the resistance between 2-7 pin was much high (usually ~9 Ω just before the driver, but resistance between 2-7 was ~60 kΩ).
- We fixed the cabling, and it started working again!!
- The cap was closed after checking, and cabling was fixed.
- Two of the old OSEM flags on PR2 cannot be removed so far. The gluing schedule was changed.
Plan for coming weeks
Tilt alignment of BF & IM
- Installation into the tank.
IMMT (Ohishi)
Past week report
- Checked the designed IMMT mirror position in IOO coordinate.
Plan for coming weeks
- Revise magnet fixture jig drawings
- Have a meeting with FCL at Mitaka on 26th morning.
Watchdog system (Tanaka)
Past week report
Start mounting on the 19 inch rack(Main 4ch WDS box).--> Complete(the wiring is still).
Start formulating an experimental plan(First test) at the KAGRA site.-->
Draft planPDF(JGW-E1706737)
Plan for coming weeks
Start creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
- JPS presentation
Travel Plans
- Travel (Week of 5/22):
- Takahashi: 24 - 25
- Shoda: 22 - 25
- Mark: 22 - 25
- Fabian: 22 - 25
- Okutomi: 22 - 25
- Fujii:
- Ishizaki: 22 - 25
- Hirata: 22 - 25
- Sato: 22 - 25
- Enzo: 22 - 25
- Ohishi: 25 night -26 (Mitaka)
- Tanaka:
- Sekiguchi(Hosei): 23 - 25
- Hirayama(Hosei): 23 - 25
- Travel (Week of 5/29):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
- Tanaka:
- Sekiguchi(Hosei):
- Hirayama(Hosei):
Next meeting
On 2017/5/26(Fri) F2F in Mitaka