Agenda/Minutes of the VIS Meeting on 2017/5/26
2017/5/26 13:30 -
Participants:
Progress report
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Installation in Y-end:
22nd(Mon)
- Dismounted the DP from the EQ stop.
- Disassembled the stat bolt from the DP.
23rd(Tue)
- Cut the stat bolt by 15mm.
- Mounted the DP. The height of the DP was increased by 5mm.
- Checked the DP weight.
24th(Wed)
- Closed the cap for BF.
- Lifted up the EQ stop, and disassembled the top plate.
- Lifted up the F1, and set the F1 at the higher position.
25th(Thu)
- Lifted up the F2 stage to the frame lock.
- Extracted the 3.3m wire from the cryostat.
- Assembled the top plate.
- Mounted the bridge frame on the hoot hold.
- Mounted the PI on the bridge frame.
- Suspended the filter chain from the TF.
Plan for coming weeks
- Tune of the TF.
- Assemble the SF damper.
- Cable between the F1 and the TF.
- Lift down the top plate to the frame lock.
- Set the PI in the chamber.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Plan for coming weeks
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 5/29):
- Takahashi: 29 - 6/2
- Shoda: 29 - 6/2
- Mark: 29 - 6/2
- Fabian: 29 - 6/2
- Okutomi: 29 - 6/2
- Fujii:
- Ishizaki: 29 - 6/2
- Hirata: 29 - 6/2
- Sato: 29 - 6/2
- Enzo: 29 - 6/2
- Ohishi:
- Tanaka:
- Sekiguchi(Hosei): 30 - 6/2
- Hirayama(Hosei): 30 - 6/2
- Travel (Week of 6/5):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
- Tanaka:
- Sekiguchi(Hosei):
- Hirayama(Hosei):
Next meeting
On 2017/6/2(Fri)