Differences between revisions 2 and 3
Revision 2 as of 2017-06-30 10:35:36
Size: 2260
Comment:
Revision 3 as of 2017-06-30 10:36:14
Size: 2262
Comment:
Deletions are marked like this. Additions are marked like this.
Line 25: Line 25:

Agenda/Minutes of the VIS Meeting on 2017/6/30

2017/6/30 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

[X-end]

  • Set the footholds.
  • Set the hoist tool.
  • Assembled the protection net and installed.
  • Covered the IP base.
  • Washed a hand lifter and pallets.

[Y-end]

26th(Mon)

  • Cabling to the feedthroughs.

27th(Tue)

  • Cabling to the feedthroughs.
  • Checked cable connection.
  • Mounted the ACCs on the TF.

28th(Wed)

  • Mounted the ACCs on the TF.
  • Tuned the IP again. Some ballasts were removed.
  • Made the cables for ACC driver.

29th(Thu)

  • Checked the ACCs with the driver.

Plan for coming weeks

  • Setting of the ACCs.
  • Setting of the BF damper.
  • Measuring of transfer functions.
  • Start the pre-assembly of BF damper in X-end.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • 7/10-?: Lighting installation in the MCE and SR clean booths

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Travel Plans

* Travel (Week of 7/3):

  • Takahashi: 3 - 7
  • Shoda: 3 - 7
  • Mark: TBD
  • Fabian: TBD
  • Okutomi: 3 - 7
  • Fujii:
  • Ishizaki: 3 - 7
  • Hirata: TBD
  • Sato: 3 - 7
  • Enzo: TBD
  • Ohishi:
  • Tanaka:
  • Komori (Ando lab.): 3 - 7
  • Hashimoto(Hosei): 3 - 6
  • Travel (Week of 7/10):
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Sato:
    • Enzo:
    • Ohishi:
    • Tanaka:
    • Hashimoto(Hosei):

Next meeting

On 2017/7/7(Fri) Next F2F: 7/??

KAGRA/Subgroups/VIS/VISMinutes20170630 (last edited 2017-06-30 16:31:14 by NaokoOhishi)