Agenda/Minutes of the VIS Meeting on 2017/6/30
2017/6/30 13:30 -
Participants:
Progress report
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
[X-end]
- Set the footholds.
- Set the hoist tool.
- Assembled the protection net and installed.
- Covered the IP base.
- Washed a hand lifter and pallets.
[Y-end]
26th(Mon)
- Cabling to the feedthroughs.
27th(Tue)
- Cabling to the feedthroughs.
- Checked cable connection.
- Mounted the ACCs on the TF.
28th(Wed)
- Mounted the ACCs on the TF.
- Tuned the IP again. Some ballasts were removed.
- Made the cables for ACC driver.
29th(Thu)
- Checked the ACCs with the driver.
Plan for coming weeks
- Setting of the ACCs.
- Setting of the BF damper.
- Measuring of transfer functions.
- Start the pre-assembly of BF damper in X-end.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Plan for coming weeks
Other site works
- 7/10-?: Lighting installation in the MCE and SR clean booths
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
* Travel (Week of 7/3):
- Takahashi: 3 - 7
- Shoda: 3 - 7
- Mark: TBD
- Fabian: TBD
- Okutomi: 3 - 7
- Fujii:
- Ishizaki: 3 - 7
- Hirata: TBD
- Sato: 3 - 7
- Enzo: TBD
- Ohishi:
- Tanaka:
- Komori (Ando lab.): 3 - 7
- Hashimoto(Hosei): 3 - 6
- Travel (Week of 7/10):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
- Tanaka:
- Hashimoto(Hosei):
Next meeting
On 2017/7/7(Fri) Next F2F: 7/??