Agenda/Minutes of the VIS Meeting on 2017/6/30
2017/6/30 13:30 -
Participants:
Progress report
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
[X-end]
- Set the footholds.
- Set the hoist tool.
- Assembled the protection net and installed.
- Covered the IP base.
- Washed a hand lifter and pallets.
[Y-end]
26th(Mon)
- Cabling to the feedthroughs.
27th(Tue)
- Cabling to the feedthroughs.
- Checked cable connection.
- Mounted the ACCs on the TF.
28th(Wed)
- Mounted the ACCs on the TF.
- Tuned the IP again. Some ballasts were removed.
- Made the cables for ACC driver.
29th(Thu)
- Checked the ACCs with the driver.
Plan for coming weeks
- Setting of the ACCs.
- Setting of the BF damper.
- Measuring of transfer functions.
- Start the pre-assembly of BF damper in X-end.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
IMMT (Ohishi)
Past week report
- Assembled IMMT magnet fixture jig at ICRR Kashiwa.
- Hirose-san pointed out that the designed position of the magnet (2mm from the rim) is not good
- because the vebel of the mirror is not negligible.
- Decided to change the magnet position to 4mm from the rim and did additional machining.
Plan for coming weeks
- Assemble magnet fixture jig in Kamioka and send it to Kashiwa when the BS glueing has done.
Watchdog system (Tanaka)
Past week report
Examination of experimental preamplifier circuit fabrication. -->
Estimate --> completed. --> Return to the start.
- Because there is a point that the estimate price of the co-op(Univ.Tokyo) is high,and other estimates are taken.
Examination of experimental preamplifier circuit fabrication. -->
- In order to adjust the measurement environment to the site on the report,the result measured using the laptop computer was added.The noise level slightly decreases in the measurement result.As aresult,it was confirmed that there was no problem.
Project-WDS PreAmp Design-V2JGW-E1706863(PDF)
Plan for coming weeks
Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->
Estimate --> Ongoing.
Adjustment of experiment schedule etc. in the KAGRA side start. --> Ongoing.
Other site works
- 7/10-?: Lighting installation in the MCE and SR clean booths
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
* Travel (Week of 7/3):
- Takahashi: 3 - 7
- Shoda: 3 - 7
- Mark: TBD
- Fabian: TBD
- Okutomi: 3 - 7
- Fujii:
- Ishizaki: 3 - 7
- Hirata: TBD
- Sato: 3 - 7
- Enzo: TBD
- Ohishi:
- Tanaka:
- Komori (Ando lab.): 3 - 7
- Hashimoto(Hosei): 3 - 6
- Travel (Week of 7/10):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Enzo:
- Ohishi:
- Tanaka:
- Hashimoto(Hosei):
Next meeting
On 2017/7/7(Fri) Next F2F: 7/??