Line 32: Line 32:
 *Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->
   *Order electronic parts -->No delivery(Coop Univ.Tokyo).

 *Experiment schedule(for KAGRA site).-->24th( Tokyo-->Toyama ),25-26th full(KAGRA),27th(Reserve and Toyama --> Tokyo )-->
   *I completed the experiment as planned.
   *The background noise was measured and it was confirmed that there was no problem.
  *I confirmed that there was no problem with connection with the system(HP coil driver and OSEM out).

  *Start production of equipment(As soon as parts are delivered).-->PCB check(Ongoing).
Line 33: Line 43:
 *Analysis of experimental results(at 25-26th(KAGRA)).

 *Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.

Agenda/Minutes of the VIS Meeting on 2017/7/28

2017/7/28 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->

    • Order electronic parts -->No delivery(Coop Univ.Tokyo).

  • Experiment schedule(for KAGRA site).-->24th( Tokyo-->Toyama ),25-26th full(KAGRA),27th(Reserve and Toyama --> Tokyo )-->

    • I completed the experiment as planned.
    • The background noise was measured and it was confirmed that there was no problem.
    • I confirmed that there was no problem with connection with the system(HP coil driver and OSEM out).
    • Start production of equipment(As soon as parts are delivered).-->PCB check(Ongoing).

Plan for coming weeks

  • Analysis of experimental results(at 25-26th(KAGRA)).
  • Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.

Other site works

  • 8/11-8/15 KAGRA site closed
  • 8/23-24 Draft Chamber Installation
  • End of Aug. to Nov.: Mozumi entrance will be closed

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • Transportation of the SR PI and PRM traversers

Travel Plans

  • Travel (Week of 7/31):
    • Takahashi:
    • Okutomi: 31 - 4
    • Sato: 31 - 4
    • Ishizaki: 31 - 4
    • Mark: 31 - 4
    • Fabian: 31 - 2
    • Hirata: 31 - 4
    • Enzo:
    • Shoda: 31 - 4
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kuroki: 31 - 3
    • Hashimoto(Hosei): 31 - 3
    • Yoshioka (Toyama): 1,2,4
    • Kouzu (ICRR): 3,4
  • Travel (Week of 8/7):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Hashimoto(Hosei):
    • Yoshioka (Toyama): 8,9,11
    • Kozu (ICRR):

Next meeting

On 2017/8/4(Fri)