Line 45: Line 45:
 * Travel (Week of 8/7):
  * Takahashi: 7 - 10
  * Okutomi: 7 - 10
  * Sato: 8 - 10
  * Ishizaki: 7 - 10
  * Mark: 7 - 10
  * Fabian:
 * Travel (Week of 8/14):
  * Takahashi: 16 - 18
  * Okutomi: 16 - 18
  * Sato:
  * Ishizaki: ??
  * Mark: 16 - 18
  * Fabian: 
Line 53: Line 53:
  * Enzo: 8 - 10
  * Shoda: 8 - 10
  * Enzo: 16 - 18
  * Shoda: 16 - 18
Line 58: Line 58:
  * Hashimoto(Hosei): 7 - 10
  * Yoshioka (Toyama): 8,9
  * Kozu (ICRR): 9 - 10
  * Arai (ICRR): 7 - 10
  * Hashimoto(Hosei): 16 - 18
  * Yoshioka (Toyama): 16,18
  * Kozu (ICRR): 16 - 18
  * Arai (ICRR): 16 - 18
  * Kasuya (TITECH): 16 - 18
Line 63: Line 64:
 * Travel (Week of 8/14):  * Travel (Week of 8/21):
Line 70: Line 71:
  * Hirata:    * Hirata:
Line 75: Line 76:
  * Tanaka:    * Tanaka:
Line 77: Line 78:
  * Yoshioka (Toyama): 16,18
  * Kozu (ICRR):
  * Yoshioka (Toyama):
  * Kozu (ICRR):    * Arai (ICRR):
  * Kasuya (TITECH):

Status report of the VIS on 2017/8/11

Progress report

Schedule Chart : (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • 8/11-8/15 KAGRA site closed
  • 8/23-24 Draft Chamber Installation
  • End of Aug. to Nov.: Mozumi entrance will be closed

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Travel Plans

  • Travel (Week of 8/14):
    • Takahashi: 16 - 18
    • Okutomi: 16 - 18
    • Sato:
    • Ishizaki: ??
    • Mark: 16 - 18
    • Fabian:
    • Hirata:
    • Enzo: 16 - 18
    • Shoda: 16 - 18
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Hashimoto(Hosei): 16 - 18
    • Yoshioka (Toyama): 16,18
    • Kozu (ICRR): 16 - 18
    • Arai (ICRR): 16 - 18
    • Kasuya (TITECH): 16 - 18
  • Travel (Week of 8/21):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Hashimoto(Hosei):
    • Yoshioka (Toyama):
    • Kozu (ICRR):
    • Arai (ICRR):
    • Kasuya (TITECH):

Next meeting

On 2017/8/18(Fri)