Line 42: Line 42:
 * Hanged RM
  * We inserted the RM around the mirror, and hanged the RM.
  * Since the number of the RM ballast masses is wrong, we asked ATC and MESCO to machine the thinner ballast masses. They were delivered almost at the same time. Now we have 2 spare ballast masses.
  * The EQ stop below the RM was assembled.

 * DGS/Circuits preparation
  * DGS people added one more field rack for PRM, but the length of the cables between the AA/AI chassis and the IO chassis was too short to set the AA/AI chassis inside the PRM field rack. We did re-cabling.

 * Top plate and Traverser were assembled and placed next to the PR3 chamber. We have silver coated screws to fix the Traverser on the Top plate, but they do not fit well. Waiting for the SDC screws.
 * BF bearing was replaced by Mark. Thanks!
 * BF LVDT calibration is ongoing.
Line 43: Line 55:
 * Hang IM/IRM

Agenda/Minutes of the VIS Meeting on 2017/8/18

2017/8/18 13:30 -

Participants:

Progress report

Schedule Charts

Schedule summary

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

[X-end]

16th(Wed)

  • Assembled the end plate for F2.
  • Prepared for the F2.
  • Extended the EQ stop to the F2 stage.
  • Put the F2 onto the end plate. The F3 was suspended from the F2.
  • Removed a ballast from the F3.

17th(Thu)

  • Checked the ACCs.

18th(Fri)

  • Closed the F3 cap.

Plan for coming weeks

  • Installation of the Filter2 in X-end.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

  • Hanged RM
    • We inserted the RM around the mirror, and hanged the RM.
    • Since the number of the RM ballast masses is wrong, we asked ATC and MESCO to machine the thinner ballast masses. They were delivered almost at the same time. Now we have 2 spare ballast masses.
    • The EQ stop below the RM was assembled.
  • DGS/Circuits preparation
    • DGS people added one more field rack for PRM, but the length of the cables between the AA/AI chassis and the IO chassis was too short to set the AA/AI chassis inside the PRM field rack. We did re-cabling.
  • Top plate and Traverser were assembled and placed next to the PR3 chamber. We have silver coated screws to fix the Traverser on the Top plate, but they do not fit well. Waiting for the SDC screws.
  • BF bearing was replaced by Mark. Thanks!
  • BF LVDT calibration is ongoing.

Plan for coming weeks

  • Hang IM/IRM

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • 8/23-24 Draft Chamber Installation
  • 8/28 11:30 - 12:30 crane inspection
  • End of Aug. to Nov.: Mozumi entrance will be closed

Safety

  • Incidents:
  • EP-30 safety
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • When to install the middle flange for ETMX

Travel Plans

  • Travel (Week of 8/21):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Hashimoto(Hosei):
    • Yoshioka (Toyama):
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 8/28):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Hashimoto(Hosei):
    • Yoshioka (Toyama):
    • Kozu (ICRR):

Next meeting

On 2017/8/25(Fri)